Index
A C E F G I L M P R S V
A
Accessing the IRF fabric to verify the configuration,60
C
Configuration terminal problems,63
Configuring basic IRF settings,59
Connecting the console cable,44
Connecting the physical IRF ports,60
Connecting the power cord,38
Contacting HP,84
Conventions,85
Cooling system,67
E
Environmental specifications,65
Examining the installation site,13
F
Fan failure (only for the 5120 EI switches),63
G
Grounding the switch,34
I
Installation tools,15
Installing a 5120 EI switch in a
Installing/removing an interface card (only for the 5120 EI switches),41
Interface cards (only for the 5120 EI switches),69 IRF fabric setup flowchart,53
L
LEDs (for the 5120 EI switches),76
LEDs (for the 5120 SI switches),80
M
Mounting the switch on a workbench,30 Mounting the switch through magnet mounting,32 Mounting the switch to a wall,30
P
Password loss,61
Physical specifications,64
Planning IRF fabric setup,54
Ports,75
Power specifications,65
Power supply failure,61
Powering on the switch,48
R
Related information,84
S
Safety recommendations,13 Setting terminal parameters,45
Setting up the configuration environment,44
SFP transceiver modules and SFP Stacking Kit (only for the 5120 SI switches),73
SFP/SFP+/XFP transceiver modules and SFP+/CX4 cables (only for the 5120 EI switches),69
V
Verifying the installation,43
87