HP E5500-48-POE manual Removing an interface card, Installing/removing a dedicated CX4/SFP+ cable

Page 47

Figure 68 Install an interface card (II)

2 2

1

NOTE:

Put away the removed filler panel for future use.

When you tighten the captive screws, the torque must not be higher than 0.4 N-m.

Removing an interface card

To remove an interface card:

1.Wear an ESD-preventive wrist strap and make sure it makes good skin contact and is well grounded.

2.Use a Phillips screwdriver to completely loosen the captive screws at both sides of the interface card.

3.Pull the interface card along the guide rails until it completely comes out of the switch chassis.

CAUTION:

Do not touch the surface-mounted components directly with your hands.

Do not use too much force during the operation.

If no new card is to be installed, install the filler panel to prevent dust and ensure good ventilation in the switch.

Installing/removing a dedicated CX4/SFP+ cable

The dedicated CX4 and SFP+ cables for the 5120 EI switches are hot swappable.

Installing a dedicated CX4/SFP+ cable

CAUTION:

The cable bending radius must be at least eight times the cable diameter.

42

Image 47
Contents HP 5120 EI & 5120 SI Switch Series Page Contents Page Iii Type Product code HP description Alias Models in the HP 5120 EI Switch SeriesModels in the HP 5120 SI Switch Series Product overview5120-24G EI 2 slots/5120-24G EI TAA 2 slots panel views Regulatory Model Numbers in the HP 5120 8G SI Switch Series5120-48G EI 2 slots/5120-48G EI TAA 2 slots panel views 5120-24G EI panel views 5120-48G EI panel views 5120-48G EI switch does not support interface cardsFront panel Front panel 5120-16G SI panel views 5120-8G SI panel views5120-48G SI panel views 5120-24G SI panel views5120-8G-PoE+ SI panel views 5120-8G-PPoE+ SI panel views5120-24G-PPoE+ SI panel views 5120-24G-PoE+ SI panel views Temperature/humidity Preparing for installationSafety recommendations Examining the installation siteHarmful gas limits in the equipment room CleannessLaser safety Dust concentration limit in the equipment roomInstallation tools Hardware installation flow Installing the switchMounting brackets Installing a 5120 EI switch in a 19-inch rackInstallation methods Chassis Front mounting brackets Rear mounting brackets Rack-mounting by using only front mounting bracketsMounting bracket kit shipped with the 5120 EI switches Attach the front mounting brackets to the chassis Attach the front mounting brackets to the rack Rack-mounting by using front and rear mounting brackets Attach the rear mounting brackets to a rack Mount the switch in the rack Attach the front brackets to the rack Installing a 5120 SI switch in a 19-inch rackChassis Bracket view Mounting position Attaching the mounting brackets to the switch chassisTo attach the mounting brackets to the switch chassis Front mounting position 5120-16G SI/5120-24G SI Front mounting position 5120-8G-PoE+ SI/5120-8G-PPoE+ SI Rack-mounting the switch Mount the switch in a rack 5120-16G SI Mounting the switch to a wall Mounting the switch on a workbenchModel Hole distance Installation procedureIntroduction to wall anchor kit Models supporting wall mountingIntroduction to magnetic mounting kit Mounting the switch through magnet mountingMagnet mounting kit Grounding the switch with a grounding strip Grounding the switchPage Make a grounding cable connector Ground through the PE wire of the AC power cord Grounding the switch by using the AC power cordConnecting the AC power cord Connecting the power cord Connect the AC power cord to the 5120-48G EI switch Connecting the switch to a +12 VDC output RPSConnect the RPS cable to the -52 to -55 RPS receptacle Connecting the switch to a -52 to -55 VDC output RPSRemove the filler panel over an interface card slot Installing an interface cardRemoving an interface card Installing/removing a dedicated CX4/SFP+ cableRemoving a dedicated CX4/SFP+ cable Verifying the installationConnection procedure Accessing the switch for the first timeSetting up the configuration environment Connecting the console cableConnection description Setting terminal parametersSet the serial port parameters Set the serial port used by the HyperTerminal connectionHyperTerminal window Powering on the switch Powering on the switchVerification before power-on Description Boot menu optionsEnter Y at the prompt Changing the startup modeEnter 9 to change the startup mode Finished User interface aux0 is available Press Enter to get started To set up an IRF fabric Setting up an IRF fabricIRF fabric setup flowchart Step Description Planning IRF fabric setupPlanning IRF fabric size and the installation site Identifying the master switch and planning IRF member IDs5120 EI IRF fabric in daisy chain topology Planning IRF topology and connections5120 SI IRF fabric in daisy chain topology Identifying physical IRF ports on the member switchesPhysical IRF port requirements Switch chassis Candidate physical Requirements IRF portsPlanning the cabling scheme Page Shows the IRF fabric topology Configuring basic IRF settingsTo do … Use the command… Connecting the physical IRF portsAccessing the IRF fabric to verify the configuration Display and maintain IRF configuration and running statusConsole login password loss Maintenance and troubleshootingPassword loss Power supply failureAC input Mark State Fan failure only for the 5120 EI switchesConfiguration terminal problems LED behaviors that identify a fan failureChassis Dimensions H × W × D Weight Appendix a Technical specificationsPhysical specifications Chassis dimensions and weightsChassis Operating temperature Relative humidity Environmental specificationsPower specifications Power input typesPower consumption specifications for non-PoE switches AC input voltage specificationsRPS DC input voltage specifications and RPS compatibility Cooling system Power consumption specifications for PoE switchesChassis Fixed fans Appendix B FRUs and compatibility matrixes Interface cards only for the 5120 EI switchesGE SFP+ transceiver modules GE SFP transceiver modulesProduct code Cable description Cable length SFP+ cablesCX4 cables Product code Cable description Connector type Cable lengthGE XFP transceiver modules UTP/STP Page 10/100/1000Base-T Ethernet port Appendix C Ports and LEDsPorts Console portSystem status LED LEDs for the 5120 EI switchesCombo interface only available on the 5120 EI switches Seven-segment LED Port mode LEDRPS status LED Seven-segment LED description SFP port LED Port mode LED Mode Port LED status Description Status10/100/1000Base-T Ethernet port LED Interface card status LED LEDs for the 5120 SI switchesPower LED Status Description RPS status LED descriptionEthernet port LED description 5120-48G SI Ethernet port LEDs description 5120-16G SI/5120-24G SI Port mode LED Mode Port LED1000Base-X SFP port LEDs description 1000Base-X SFP port LEDRelated information Support and other resourcesContacting HP Convention Description ConventionsConvention Description Network topology icons Index Verifying the installation,43