Overview
NOTE:
Transmitter Measurements
Receiver Measurements
Other
Chapter 2, Making Measurements
Overview
This chapter presents measurement tasks most commonly performed when testing CDMA/PCS base station equipment. The measurements are separated by type: transmitter tests, followed by the receiver tests. For descriptions of general Software use, refer to chapter 3, "Operating Overview".
The test procedures outlined in this chapter require that you have already configured the Test System as outlined in chapter 1, "Getting Started".
•"Average Power" on page 26
•"Modulation Quality (Rho)" on page 28
•"Code Domain Power" on page 30
•"Code Domain Timing" on page 32
•"Code Domain Phase" on page 34
•"Transmit Spectrum" on page 36
•"Receiver Sensitivity" on page 40
•"Receiver Performance in Additive Noise" on page 42
•"Search for PN Offset" on page 44
•"Check
25