Chapter 2, Making Measurements
Code Domain Timing
Code Domain Timing
Overview | Similar to the Code Domain Power test, this measurement shows the timing |
| relationship between the various Walsh channels and the Pilot channel. |
EVEN SECOND/
SYNC IN
H
Transmitter Port
Clock
(Rear Panel)
SYNTH
REF IN
Time Base
H
RF IN/OUT
Figure 12
CAUTION:
NOTE:
Requirements
Before performing any transmitter measurements, make sure that the power level applied to the RF IN/OUT port of the PCS Interface does not exceed the published limit. For CDMA base station signals this is 1 Watt (+30 dBm). You may have to use an external attenuator or directional coupler, depending on the power output for your transmitter. Signal levels greater than the specified maximum can cause damage to the test equipment.
The test procedures outlined in this section require that you have already configured the Test System as outlined in chapter 1, "Getting Started".
•You must have a means of turning on the base station transmitter and enabling various Walsh channels (such as Pilot, Sync, Traffic, and Paging).
•Synchronization is required, so you must have an
•You must know the following about the base station and setup:
❒The base station channel number setting.
❒The PN Offset for the
32