HP 9000 800t s Z7634-96002 manual Seismic Rack Kit

Page 10

Addendum to D Class Enterprise Servers System Installation Guide

Seismic Rack Kit

Seismic Rack Kit

The HP 9000 Series 800t D Class Server can be fitted with a seismic rack mount kit for installation in a 19-inch open relay rack. This earthquake rack fulfills Bellcore requirements for Telecommunication equipment installed in a NEBS-compatible central office. Table 1-1 shows the parts included for this installation, and identification numbers for each component as it appears on Figure 1-1 through Figure 1-6.

Table 1-1

Earthquake Rack-Mount Components

 

 

 

 

 

 

 

 

 

Description

 

Quantity

Item

Part Number

 

 

 

 

Number

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Assembly, Top Cover

 

1

1

Z7616-60008

 

 

 

 

 

 

 

Bracket, Main, Left

 

1

2

Z7616-00009

 

 

 

 

 

 

 

Bracket, Main, Right

 

1

3

Z7616-00010

 

 

 

 

 

 

 

Assembly, Panel Latch

 

1

4

Z7616-60005

 

 

 

 

 

 

 

Bezel Mount, Left

 

1

5

Z7616-00012

 

 

 

 

 

 

 

Bezel Mount, Right

 

1

6

Z7616-00013

 

 

 

 

 

 

 

Pan, Base

 

1

7

Z7616-00014

 

 

 

 

 

 

 

Support, Bezel

 

1

8

Z7616-00015

 

 

 

 

 

 

 

Bracket, Rear

 

2

9

Z7630-00001

 

 

 

 

 

 

 

Plate, Cover

 

2

10

Z7630-00016

 

 

 

 

 

 

 

Assembly, Slide, Left

 

1

11

Z7616-60003

 

 

 

 

 

 

 

Assembly, Slide, Right

 

1

12

Z7616-60004

 

 

 

 

 

 

 

Weldment, Mounting Tray

 

1

13

A3262-60024

 

 

 

 

 

 

 

Assembly, Rack, Bezel

 

1

14

A3262-60036

 

 

 

 

 

 

 

Label, Lock

 

1

15

Z7616-80005

 

 

 

 

 

 

 

Pan Screw (12-24 x .62”)

 

20

16

2940-0289

 

 

 

 

 

 

10

Chapter 1

Image 10
Contents Addendum to D Class Enterprise Servers Third EditionPage Printing History Printing HistoryAbout This Manual Contents Contents Addendum to D Class Contents Purpose of this Addendum Tools NeededSeismic Rack Kit Seismic Rack Kit Site Hazard Considerations Installation Seismic Rack Installation Installation Installation Attach cable retractor item 26, -3 to right main bracket as Tray Seismic Rack Installation Installation DC Power Supply ConnectionsPower supply cable is used as the main disconnect device DC Power Cable Pinouts Function Color Pin NoFor this equipment. The key switch on front of SPU does not Safety Grounding Procedures DC Power Cable Pin DiagramReplacement Power Supply SpecificationsDC Power Specifications Data Regulatory/Safety Statements FCC Statement USA Only IEC Statement WorldwideInternational Acoustic Noise Emissions Product Noise Declaration Germany OnlyGeräuschemission EMC Certification SafetyEMC Regulatory EMC LabelsAccording to ISO/IEC Guide 22 and EN Conforms to the following Product SpecificationsSafety Manufacturer’s Name