HP 9000 800t s Z7634-96002 manual Installation

Page 20

Addendum to D Class Enterprise Servers System Installation Guide

Installation

23.Secure the bezel to the bezel mounts with the cover plates (item 10, 2 places) shown in Figure 1-6.

Figure 1-6 Seismic Rack Installation

24.Route all cables to allow unrestricted movement of the assembly when sliding in and out. Attach wires to cable retractor (Figure 1-3, item 26) using cable ties (Figure 1-3, item 27).

20

Chapter 1

Image 20
Contents Addendum to D Class Enterprise Servers Third EditionPage Printing History Printing HistoryAbout This Manual Contents Contents Addendum to D Class Contents Purpose of this Addendum Tools NeededSeismic Rack Kit Seismic Rack Kit Site Hazard Considerations Installation Seismic Rack Installation Installation Installation Attach cable retractor item 26, -3 to right main bracket as Tray Seismic Rack Installation Installation DC Power Supply ConnectionsFor this equipment. The key switch on front of SPU does not DC Power Cable Pinouts Function Color Pin NoPower supply cable is used as the main disconnect device Safety Grounding Procedures DC Power Cable Pin DiagramDC Power Specifications Data SpecificationsReplacement Power Supply Regulatory/Safety Statements FCC Statement USA Only IEC Statement WorldwideInternational Geräuschemission Product Noise Declaration Germany OnlyAcoustic Noise Emissions Safety EMC RegulatoryEMC Certification EMC LabelsConforms to the following Product Specifications SafetyAccording to ISO/IEC Guide 22 and EN Manufacturer’s Name