HP 9000 800t s Z7634-96002 manual Installation

Page 15

Addendum to D Class Enterprise Servers System Installation Guide

Installation

7.Assemble base pan (Figure 1-2, item 7) to lower row of holes on main brackets, but do not tighten the hardware yet. With pan positioned between the main bracket panels from the rear, raise it to align the holes as needed. Use item 19 hardware in four places on each bracket. Use the item 16, 17, 18 hardware to fasten each side of the pan to the vertical channel (2 pls).

Figure 1-2 Seismic Rack Installation

Chapter 1

15

Image 15
Contents Third Edition Addendum to D Class Enterprise ServersPage Printing History Printing HistoryAbout This Manual Contents Contents Addendum to D Class Contents Tools Needed Purpose of this AddendumSeismic Rack Kit Seismic Rack Kit Site Hazard Considerations Installation Seismic Rack Installation Installation Installation Attach cable retractor item 26, -3 to right main bracket as Tray Seismic Rack Installation Installation Connections DC Power SupplyDC Power Cable Pinouts Function Color Pin No Power supply cable is used as the main disconnect deviceFor this equipment. The key switch on front of SPU does not DC Power Cable Pin Diagram Safety Grounding ProceduresSpecifications Replacement Power SupplyDC Power Specifications Data Regulatory/Safety Statements IEC Statement Worldwide FCC Statement USA OnlyInternational Product Noise Declaration Germany Only Acoustic Noise EmissionsGeräuschemission EMC Labels SafetyEMC Regulatory EMC CertificationManufacturer’s Name Conforms to the following Product SpecificationsSafety According to ISO/IEC Guide 22 and EN