HP 9000 800t s Z7634-96002 manual Seismic Rack Installation

Page 19

Addendum to D Class Enterprise Servers System Installation Guide

Installation

18.Attach the latch panel (item 4) to front of mounting tray using five screws.

19.With the computer securely engaged within the rack assembly, check alignment of top cover (refer to Step 10) and tighten all fasteners.

Figure 1-5 Seismic Rack Installation

D Class Server

20.Install the emblem insert and door removed from the standard bezel (refer to Step 3) onto the wide bezel (Figure 1-6, item 14).

21.Remove handles from the wide bezel and position it onto the bezel mounts attached to the rack.

22.Apply lock label (item 15) to the front door where shown.

Chapter 1

19

Image 19
Contents Third Edition Addendum to D Class Enterprise ServersPage Printing History Printing HistoryAbout This Manual Contents Contents Addendum to D Class Contents Tools Needed Purpose of this AddendumSeismic Rack Kit Seismic Rack Kit Site Hazard Considerations Installation Seismic Rack Installation Installation Installation Attach cable retractor item 26, -3 to right main bracket as Tray Seismic Rack Installation Installation Connections DC Power SupplyPower supply cable is used as the main disconnect device DC Power Cable Pinouts Function Color Pin NoFor this equipment. The key switch on front of SPU does not DC Power Cable Pin Diagram Safety Grounding ProceduresReplacement Power Supply SpecificationsDC Power Specifications Data Regulatory/Safety Statements IEC Statement Worldwide FCC Statement USA OnlyInternational Acoustic Noise Emissions Product Noise Declaration Germany OnlyGeräuschemission EMC Labels SafetyEMC Regulatory EMC CertificationManufacturer’s Name Conforms to the following Product SpecificationsSafety According to ISO/IEC Guide 22 and EN