HP 9000 800t s Z7634-96002 manual Installation

Page 16

Addendum to D Class Enterprise Servers System Installation Guide

Installation

8.Using item 16 screws (only) attach the bezel mount brackets (items 5, 6 in Figure 1-3) to the vertical rails as shown. Attach the two clip-on receptacles (item 30) at the bottom of the brackets as shown.

9.For full GR-63-CORE NEBS compliance, attach only the two bezel clips at the top of the brackets using item 29 screws. (Optionally attach two clips at the bottom as well.)

10.Attach the bezel support (item 8) to lower area of vertical rails using item 16 screws (only) as shown. Top edge of bezel support is flush with bottom of bezel mount brackets.

11.Position top cover (item 1) in upper area as shown. Install but don’t tighten screws.

Figure 1-3 Seismic Rack Installation

16

Chapter 1

Image 16
Contents Addendum to D Class Enterprise Servers Third EditionPage Printing History Printing HistoryAbout This Manual Contents Contents Addendum to D Class Contents Purpose of this Addendum Tools NeededSeismic Rack Kit Seismic Rack Kit Site Hazard Considerations Installation Seismic Rack Installation Installation Installation Attach cable retractor item 26, -3 to right main bracket as Tray Seismic Rack Installation Installation DC Power Supply ConnectionsPower supply cable is used as the main disconnect device DC Power Cable Pinouts Function Color Pin NoFor this equipment. The key switch on front of SPU does not Safety Grounding Procedures DC Power Cable Pin DiagramReplacement Power Supply SpecificationsDC Power Specifications Data Regulatory/Safety Statements FCC Statement USA Only IEC Statement WorldwideInternational Acoustic Noise Emissions Product Noise Declaration Germany OnlyGeräuschemission Safety EMC RegulatoryEMC Certification EMC LabelsConforms to the following Product Specifications SafetyAccording to ISO/IEC Guide 22 and EN Manufacturer’s Name