Roberts Gorden manual Linear Heater Assembly Overview

Page 1

SECTION 6: HEATER INSTALLATION

FIGURE 15: Linear Heater Assembly Overview

 

 

 

 

 

 

U-Clips

Adapter

 

 

 

 

 

 

 

Vent

 

 

 

 

 

Tube

Turbulator (With Select Models)

 

Reflector

 

 

 

 

 

 

 

Reflector End Cap

 

Tube

Reflector Hanger

Coupling

Reflector Support

 

 

Burner

Tube Clamp Package

Burner

Tube and

 

 

 

 

 

 

 

 

 

 

 

15

Image 1
Contents Linear Heater Assembly Overview Linear Heater Layout Overview Description Part Number Burner Tube InstallationCoupling and Tube Assembly Tube Clamp Package InstallationDescription Tube Clamp Package2 Coupling and Tube Assembly 1 Coupling and Tube AssemblyTube Length ModelTurbulator Installation Model Tube Section Turbulator InstallationHanger Burner Tube Reflector Description Part Number Reflector Support Package 1 Reflector, U-Clip and Reflector Support InstallationBurner Installation Optional Heater Accessories Tube Heater Assembly Overview Tube Heater Layout Overview Minimum Distance Required Elbow Package Configuration .2.1 Elbow InstallationBetween Burner and Elbow Elbow Package3 Reflector Joint Installation 2 Elbow Installation4 Reflector Joint Installation Reflector Joint Detail 5 Reflector Joint Detail2 Side Reflector Installation Reflector Side Extension 1 Bracket Installation02712700 Description Part Number Lower Clearance Shield Package Distance a Extension 2 Frame Shield Installation3 Grille Installation 2 Grille End Cap InstallationUnited States Requirements VentingCanadian Requirements Vertical Venting Unvented OperationUnvented Operation Tube Termination Vertical Ventilation 4 10 cm Pipe Horizontal Ventilation 4 10 cm PipeTOP View Common Side Wall VentingCommon Vertical Venting Outside Combustion Air Supply Vertical Outside Air Supply for Single Heater InstallationHorizontal Outside Air Supply for Double Heater Installation Vertical Outside Air Supply for Double Heater InstallationGAS Piping Correct Positions Line Voltage Thermostat Wiring WiringFront View Low Voltage Thermostat WiringInternal Wiring Electrical Connection to the Burner Ladder DiagramPre-Season Maintenance and Annual Inspection Operation and MaintenanceSequence of Operation To Shut Off HeaterPlease see Page 49, .5 for suggested items to inspect Vehicles and Other Vicinity of the HeaterObjects ReflectorElectrode Burner Cup and OrificeThermostat Suspension PointsTroubleshooting 12.1 Troubleshooting Flow ChartTroubleshooting Natural Propane Manifold Gas Pressure Setting Top View of HeaterReplacement Parts TOP View Rear ViewDescription Part Number Dimensions General SpecificationsGAS Pressure AT Manifold Pipe ConnectionROBERTS-GORDON LLC will PAY for Warranty is Void ifROBERTS-GORDON LLC will not PAY for Limitations on Authority RepresentativesPage Mail or Fax to Owner Warranty Registration CardPage Page Keep all flammable objects, liquids and vapors the minimum Fire HazardRequired clearances to combustibles away from heater Heater