Roberts Gorden Linear Heater manual Vertical Outside Air Supply for Double Heater Installation

Page 26

BH-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

8.11.4 Vertical Outside Air Supply for Double Heater Installation

Vent Cap

Roof

6" (15 cm) Single Wall Pipe

Sweeping 'T'

Flex Hose

Connection

(Recommended)

 

Burner

Burner

Band Clamp

4" (10 cm)

 

Flex Hose

Single Wall Pipe

(Recommended)

(Recommended)

 

 

 

Description

Part Number

Vent Cap 6" (15 cm)

90502302

 

 

Requirements:

• Heaters must be controlled by a common thermostat.

8.11.5 Horizontal Outside Air Supply for Double Heater Installation

Vent Cap

Wall

 

Outside

Description

Part Number

Vent Cap 6" (15 cm)

90502302

 

 

6" (15 cm) Single Wall Pipe

Flex Hose

(Recommended)

Burner

Sweeping 'Y'

Connection

4" (10 cm) Single Wall Pipe

(Seal All Joints)

Burner

Band Clamp

(Recommended)

Requirements:

• Heaters must be controlled by a common thermostat.

40

Image 26
Contents Linear Heater Assembly Overview Linear Heater Layout Overview Burner Tube Installation Description Part NumberDescription Tube Clamp Package InstallationCoupling and Tube Assembly Tube Clamp PackageTube Length 1 Coupling and Tube Assembly2 Coupling and Tube Assembly ModelTurbulator Installation Turbulator Installation Model Tube SectionHanger Burner Tube Reflector 1 Reflector, U-Clip and Reflector Support Installation Description Part Number Reflector Support PackageBurner Installation Optional Heater Accessories Tube Heater Assembly Overview Tube Heater Layout Overview Between Burner and Elbow Elbow Package Configuration .2.1 Elbow InstallationMinimum Distance Required Elbow Package4 Reflector Joint Installation 2 Elbow Installation3 Reflector Joint Installation 5 Reflector Joint Detail Reflector Joint Detail02712700 Reflector Side Extension 1 Bracket Installation2 Side Reflector Installation Description Part Number Lower Clearance Shield Package 2 Frame Shield Installation Distance a Extension2 Grille End Cap Installation 3 Grille InstallationCanadian Requirements VentingUnited States Requirements Unvented Operation Tube Termination Unvented OperationVertical Venting Horizontal Ventilation 4 10 cm Pipe Vertical Ventilation 4 10 cm PipeCommon Side Wall Venting TOP ViewCommon Vertical Venting Vertical Outside Air Supply for Single Heater Installation Outside Combustion Air SupplyVertical Outside Air Supply for Double Heater Installation Horizontal Outside Air Supply for Double Heater InstallationGAS Piping Correct Positions Wiring Line Voltage Thermostat WiringLow Voltage Thermostat Wiring Front ViewInternal Wiring Ladder Diagram Electrical Connection to the BurnerSequence of Operation Operation and MaintenancePre-Season Maintenance and Annual Inspection To Shut Off HeaterPlease see Page 49, .5 for suggested items to inspect Objects Vicinity of the HeaterVehicles and Other ReflectorThermostat Burner Cup and OrificeElectrode Suspension PointsTroubleshooting Troubleshooting Flow Chart 12.1Troubleshooting Manifold Gas Pressure Setting Top View of Heater Natural PropaneReplacement Parts Rear View TOP ViewDescription Part Number GAS Pressure AT Manifold General SpecificationsDimensions Pipe ConnectionROBERTS-GORDON LLC will not PAY for Warranty is Void ifROBERTS-GORDON LLC will PAY for Limitations on Authority RepresentativesPage Owner Warranty Registration Card Mail or Fax toPage Page Required clearances to combustibles away from heater Fire HazardKeep all flammable objects, liquids and vapors the minimum Heater