Roberts Gorden Linear Heater manual Tube Heater Layout Overview

Page 12

BH-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

FIGURE 19: U-Tube Heater Layout Overview

LEGEND

Burner

Reflector

Tube 10' (3.0 m) Tube 5' (1.5 m)**

Tube/Reflector

Hanger

Coupling

Assembly

U-tube

Vent Adapter (Not Shown)

a = 14" (36 cm)

Reflector Width (Not Shown)

b = 2" (5 cm) End Cap to Burner

c = 2" (5 cm) End Cap to Hanger

d = 7' 6" (2.3 m) Distance First Hanger

e = 10' (3.0 m)

Distance Between Hangers

f = 5' (1.5 m)

Distance Between Last Full Tube Hanger and Half Tube Hanger

g= 12.5" (32 cm) Burner Length h = 11" (28 cm) Burner Height

*Requires the last reflector before the u-tube to be cut in half for use on both sides.

**Requires the last tube before the u-tube to be cut in half for use on both sides.

 

bc

 

 

g

 

e

 

h

 

 

 

 

20' (6.1 m) Tube Length*

 

 

bc

 

 

g

d

f

 

h

 

 

 

 

30' (9.1 m) Tube Length**

 

 

bc

 

 

g

d

e

 

h

 

 

 

 

40' (12.2 m) Tube Length

 

 

bc

 

 

g

d

e

f

h

 

 

 

 

50' (15.2 m) Tube Length* **

 

26

Image 12
Contents Linear Heater Assembly Overview Linear Heater Layout Overview Burner Tube Installation Description Part NumberTube Clamp Package Installation Coupling and Tube AssemblyDescription Tube Clamp Package1 Coupling and Tube Assembly 2 Coupling and Tube AssemblyTube Length ModelTurbulator Installation Turbulator Installation Model Tube SectionHanger Burner Tube Reflector 1 Reflector, U-Clip and Reflector Support Installation Description Part Number Reflector Support PackageBurner Installation Optional Heater Accessories Tube Heater Assembly Overview Tube Heater Layout Overview Elbow Package Configuration .2.1 Elbow Installation Minimum Distance RequiredBetween Burner and Elbow Elbow Package2 Elbow Installation 3 Reflector Joint Installation4 Reflector Joint Installation 5 Reflector Joint Detail Reflector Joint DetailReflector Side Extension 1 Bracket Installation 2 Side Reflector Installation02712700 Description Part Number Lower Clearance Shield Package 2 Frame Shield Installation Distance a Extension2 Grille End Cap Installation 3 Grille InstallationVenting United States RequirementsCanadian Requirements Unvented Operation Vertical VentingUnvented Operation Tube Termination Horizontal Ventilation 4 10 cm Pipe Vertical Ventilation 4 10 cm PipeCommon Side Wall Venting TOP ViewCommon Vertical Venting Vertical Outside Air Supply for Single Heater Installation Outside Combustion Air SupplyVertical Outside Air Supply for Double Heater Installation Horizontal Outside Air Supply for Double Heater InstallationGAS Piping Correct Positions Wiring Line Voltage Thermostat WiringLow Voltage Thermostat Wiring Front ViewInternal Wiring Ladder Diagram Electrical Connection to the BurnerOperation and Maintenance Pre-Season Maintenance and Annual InspectionSequence of Operation To Shut Off HeaterPlease see Page 49, .5 for suggested items to inspect Vicinity of the Heater Vehicles and OtherObjects ReflectorBurner Cup and Orifice ElectrodeThermostat Suspension PointsTroubleshooting Troubleshooting Flow Chart 12.1Troubleshooting Manifold Gas Pressure Setting Top View of Heater Natural PropaneReplacement Parts Rear View TOP ViewDescription Part Number General Specifications DimensionsGAS Pressure AT Manifold Pipe ConnectionWarranty is Void if ROBERTS-GORDON LLC will PAY forROBERTS-GORDON LLC will not PAY for Limitations on Authority RepresentativesPage Owner Warranty Registration Card Mail or Fax toPage Page Fire Hazard Keep all flammable objects, liquids and vapors the minimumRequired clearances to combustibles away from heater Heater