Roberts Gorden Linear Heater manual Turbulator Installation Model Tube Section

Page 6

BH-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

Step 6.4 Turbulator Installation

Turbulator must be installed in the last standard section of tube. Turbulator is not required on the BH-125/150/175/200.

 

 

T

 

 

w

 

 

i

Turbulator

 

s

 

t

Section

 

 

 

Turbulator

Tab

 

Adapter

 

 

Turbulator section 2.5'

 

(76.2 cm) (stainless) used in

Fold tab around outside

BH-40 heaters must be in the

section of turbulator nearest

of tube nearest to the vent to

hold turbulator in place.

to the burner.

 

Turbulator Installation

Model

Tube Section

BH-40

1st 10' (3 m) Section

 

 

BH-60

2nd 10' (3 m) Section

 

 

BH-80

2nd 10' (3 m) Section

 

 

BH-100

3rd 10' (3 m) Section

 

 

BH-115

3rd 10' (3 m) Section

 

 

BH-125

N/A

 

 

BH-140

4th 10' (3 m) Section

 

 

BH-150

N/A

 

 

BH-175

N/A

 

 

BH-200

N/A

 

 

Pull String

Description

Part Number

Turbulator Adapter 2.5' (76.2 cm)

03051503

 

 

Turbulator Section 2' (61 cm)

03051504

 

 

Turbulator Section 2.5' (76.2 cm)(Stainless)

03051505

 

 

Tube

91409XXX

 

 

20

Image 6
Contents Linear Heater Assembly Overview Linear Heater Layout Overview Burner Tube Installation Description Part NumberDescription Tube Clamp Package InstallationCoupling and Tube Assembly Tube Clamp PackageTube Length 1 Coupling and Tube Assembly2 Coupling and Tube Assembly ModelTurbulator Installation Turbulator Installation Model Tube SectionHanger Burner Tube Reflector 1 Reflector, U-Clip and Reflector Support Installation Description Part Number Reflector Support PackageBurner Installation Optional Heater Accessories Tube Heater Assembly Overview Tube Heater Layout Overview Between Burner and Elbow Elbow Package Configuration .2.1 Elbow InstallationMinimum Distance Required Elbow Package2 Elbow Installation 3 Reflector Joint Installation4 Reflector Joint Installation 5 Reflector Joint Detail Reflector Joint DetailReflector Side Extension 1 Bracket Installation 2 Side Reflector Installation02712700 Description Part Number Lower Clearance Shield Package 2 Frame Shield Installation Distance a Extension2 Grille End Cap Installation 3 Grille InstallationVenting United States RequirementsCanadian Requirements Unvented Operation Vertical VentingUnvented Operation Tube Termination Horizontal Ventilation 4 10 cm Pipe Vertical Ventilation 4 10 cm PipeCommon Side Wall Venting TOP ViewCommon Vertical Venting Vertical Outside Air Supply for Single Heater Installation Outside Combustion Air SupplyVertical Outside Air Supply for Double Heater Installation Horizontal Outside Air Supply for Double Heater InstallationGAS Piping Correct Positions Wiring Line Voltage Thermostat WiringLow Voltage Thermostat Wiring Front ViewInternal Wiring Ladder Diagram Electrical Connection to the BurnerSequence of Operation Operation and MaintenancePre-Season Maintenance and Annual Inspection To Shut Off HeaterPlease see Page 49, .5 for suggested items to inspect Objects Vicinity of the HeaterVehicles and Other ReflectorThermostat Burner Cup and OrificeElectrode Suspension PointsTroubleshooting Troubleshooting Flow Chart 12.1Troubleshooting Manifold Gas Pressure Setting Top View of Heater Natural PropaneReplacement Parts Rear View TOP ViewDescription Part Number GAS Pressure AT Manifold General SpecificationsDimensions Pipe ConnectionROBERTS-GORDON LLC will not PAY for Warranty is Void ifROBERTS-GORDON LLC will PAY for Limitations on Authority RepresentativesPage Owner Warranty Registration Card Mail or Fax toPage Page Required clearances to combustibles away from heater Fire HazardKeep all flammable objects, liquids and vapors the minimum Heater