Roberts Gorden Linear Heater manual Burner Tube Installation, Description Part Number

Page 3

SECTION 6: HEATER INSTALLATION

FIGURE 17: Linear Heater Layout Overview (Continued)

 

bc

 

 

 

 

 

 

 

g

d

e

e

e

e

e

 

 

f

 

 

 

 

 

 

 

 

60' (18.3 m) Tube Length

 

 

 

 

 

 

 

 

bc

 

 

 

 

 

 

 

g

d

e

e

e

e

e

e

 

f

 

 

 

 

 

 

 

 

70' (21. 3 m) Tube Length

 

 

 

 

 

 

 

 

bc

 

 

 

 

 

 

 

g

d

e

e

e

e

e

e

e

f

 

 

 

 

 

 

 

 

80' (24.4 m) Tube Length

 

 

 

 

 

 

 

Step 6.1 Burner Tube Installation

NOTE:

Tubing requires a downward slope of 1/2" (13 mm)

per 20' (6 m) away from burner.

S-Hook

Hanger

Burner Tube

7' 6" ± 1'

(229 cm ± 25 cm)

Offset mounting hole must be to the top.

Weld seam must be to the bottom of the tube.

Description

Part Number

Burner Tube

03051XXX

 

 

S-Hook

91907302

 

 

Tube/Reflector Hanger

03090100

 

 

17

Image 3
Contents Linear Heater Assembly Overview Linear Heater Layout Overview Description Part Number Burner Tube InstallationTube Clamp Package Tube Clamp Package InstallationCoupling and Tube Assembly DescriptionModel 1 Coupling and Tube Assembly2 Coupling and Tube Assembly Tube LengthTurbulator Installation Model Tube Section Turbulator InstallationHanger Burner Tube Reflector Description Part Number Reflector Support Package 1 Reflector, U-Clip and Reflector Support InstallationBurner Installation Optional Heater Accessories Tube Heater Assembly Overview Tube Heater Layout Overview Elbow Package Elbow Package Configuration .2.1 Elbow InstallationMinimum Distance Required Between Burner and Elbow2 Elbow Installation 3 Reflector Joint Installation4 Reflector Joint Installation Reflector Joint Detail 5 Reflector Joint DetailReflector Side Extension 1 Bracket Installation 2 Side Reflector Installation02712700 Description Part Number Lower Clearance Shield Package Distance a Extension 2 Frame Shield Installation3 Grille Installation 2 Grille End Cap InstallationVenting United States RequirementsCanadian Requirements Unvented Operation Vertical VentingUnvented Operation Tube Termination Vertical Ventilation 4 10 cm Pipe Horizontal Ventilation 4 10 cm PipeTOP View Common Side Wall VentingCommon Vertical Venting Outside Combustion Air Supply Vertical Outside Air Supply for Single Heater InstallationHorizontal Outside Air Supply for Double Heater Installation Vertical Outside Air Supply for Double Heater InstallationGAS Piping Correct Positions Line Voltage Thermostat Wiring WiringFront View Low Voltage Thermostat WiringInternal Wiring Electrical Connection to the Burner Ladder DiagramTo Shut Off Heater Operation and MaintenancePre-Season Maintenance and Annual Inspection Sequence of OperationPlease see Page 49, .5 for suggested items to inspect Reflector Vicinity of the HeaterVehicles and Other ObjectsSuspension Points Burner Cup and OrificeElectrode ThermostatTroubleshooting 12.1 Troubleshooting Flow ChartTroubleshooting Natural Propane Manifold Gas Pressure Setting Top View of HeaterReplacement Parts TOP View Rear ViewDescription Part Number Pipe Connection General SpecificationsDimensions GAS Pressure AT ManifoldLimitations on Authority Representatives Warranty is Void ifROBERTS-GORDON LLC will PAY for ROBERTS-GORDON LLC will not PAY forPage Mail or Fax to Owner Warranty Registration CardPage Page Heater Fire HazardKeep all flammable objects, liquids and vapors the minimum Required clearances to combustibles away from heater