Roberts Gorden Linear Heater Elbow Package Configuration .2.1 Elbow Installation, Clip Package

Page 13

SECTION 7: OPTIONAL HEATER ACCESSORIES

FIGURE 20: U-Tube Layout Overview (Continued)

 

bc

 

 

 

g

d

e

e

 

h

 

 

 

 

 

60' (18.3 m) Tube Length

 

 

 

bc

 

 

 

g

d

e

e

f

h

 

 

 

 

 

70' (21.3 m) Tube Length**

 

 

 

bc

 

 

 

g

d

e

e

e

h

 

 

 

 

 

80' (24.4 m) Tube Length

 

 

7.2Elbow Package Configuration Step 7.2.1 Elbow Installation

 

Tube

 

 

 

 

 

 

Minimum Distance Required

 

Coupling

 

Between Burner and Elbow

 

 

 

Model

Minimum

 

 

 

Distance

 

 

 

 

 

 

 

BH-40

10' (3 m)

 

 

 

BH-60

10' (3 m)

Description

Part Number

90° Elbow

BH-80

10' (3 m)

BH-100

15' (4.5 m)

Elbow Package

02718702

 

 

BH-115

15' (4.5 m)

90° Elbow

01335801

 

 

BH-125

15' (4.5 m)

Coupling

01312700

 

 

BH-140

15' (4.5 m)

Reflector End Cap

02750800

 

 

BH-150

15' (4.5 m)

Reflector Joint Piece

02750900

 

 

BH-175

15' (4.5 m)

U-Clip Package

91107720

 

 

BH-200

15' (4.5 m)

 

 

 

 

 

 

 

27

Image 13
Contents Linear Heater Assembly Overview Linear Heater Layout Overview Description Part Number Burner Tube InstallationCoupling and Tube Assembly Tube Clamp Package InstallationDescription Tube Clamp Package2 Coupling and Tube Assembly 1 Coupling and Tube AssemblyTube Length ModelTurbulator Installation Model Tube Section Turbulator InstallationHanger Burner Tube Reflector Description Part Number Reflector Support Package 1 Reflector, U-Clip and Reflector Support InstallationBurner Installation Optional Heater Accessories Tube Heater Assembly Overview Tube Heater Layout Overview Minimum Distance Required Elbow Package Configuration .2.1 Elbow InstallationBetween Burner and Elbow Elbow Package3 Reflector Joint Installation 2 Elbow Installation4 Reflector Joint Installation Reflector Joint Detail 5 Reflector Joint Detail2 Side Reflector Installation Reflector Side Extension 1 Bracket Installation02712700 Description Part Number Lower Clearance Shield Package Distance a Extension 2 Frame Shield Installation3 Grille Installation 2 Grille End Cap InstallationUnited States Requirements VentingCanadian Requirements Vertical Venting Unvented OperationUnvented Operation Tube Termination Vertical Ventilation 4 10 cm Pipe Horizontal Ventilation 4 10 cm PipeTOP View Common Side Wall VentingCommon Vertical Venting Outside Combustion Air Supply Vertical Outside Air Supply for Single Heater InstallationHorizontal Outside Air Supply for Double Heater Installation Vertical Outside Air Supply for Double Heater InstallationGAS Piping Correct Positions Line Voltage Thermostat Wiring WiringFront View Low Voltage Thermostat WiringInternal Wiring Electrical Connection to the Burner Ladder DiagramPre-Season Maintenance and Annual Inspection Operation and MaintenanceSequence of Operation To Shut Off HeaterPlease see Page 49, .5 for suggested items to inspect Vehicles and Other Vicinity of the HeaterObjects ReflectorElectrode Burner Cup and OrificeThermostat Suspension PointsTroubleshooting 12.1 Troubleshooting Flow ChartTroubleshooting Natural Propane Manifold Gas Pressure Setting Top View of HeaterReplacement Parts TOP View Rear ViewDescription Part Number Dimensions General SpecificationsGAS Pressure AT Manifold Pipe ConnectionROBERTS-GORDON LLC will PAY for Warranty is Void ifROBERTS-GORDON LLC will not PAY for Limitations on Authority RepresentativesPage Mail or Fax to Owner Warranty Registration CardPage Page Keep all flammable objects, liquids and vapors the minimum Fire HazardRequired clearances to combustibles away from heater Heater