Roberts Gorden Linear Heater manual Tube Clamp Package Installation, Coupling and Tube Assembly

Page 4

BH-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

Step 6.2 Tube Clamp Package Installation

 

Tube Clamp

Bolt

 

 

 

Flat

 

 

Washer

 

 

Nut

 

 

(Torque 120 in/lb

 

 

13.56 Nm)

 

Description

Part Number

 

Tube Clamp Package

01318901

 

Tube Clamp

01396801

 

Bolt

97113940

 

Flat Washer

95211600

 

Nut

92113900

 

Step 6.3 Coupling and Tube Assembly

 

Close coupling

Start slide bar/coupling lock

A with tab.

B onto coupling.

 

Tab

 

 

 

Slide Bar/Coupling Lock

 

 

Wide End

 

 

Coupling

Open

3" (8 cm) to

 

 

 

 

4" (10 cm)

 

Closed

 

 

C Insert tubes into coupling.

D Tighten coupling to join tubes.

 

 

Slide Bar/Coupling Lock

 

Orient coupling so that

Coupling

 

the impact block is in the

 

 

2:00 or 10:00 o’clock

 

 

positions.

Tube

 

Tube

 

 

Tube

Description

Part Number

Coupling

01329600

 

 

Slide Bar/Coupling Lock

01329700

 

Tube

91409XXX

18

Image 4
Contents Linear Heater Assembly Overview Linear Heater Layout Overview Burner Tube Installation Description Part NumberTube Clamp Package Installation Coupling and Tube AssemblyDescription Tube Clamp Package1 Coupling and Tube Assembly 2 Coupling and Tube AssemblyTube Length ModelTurbulator Installation Turbulator Installation Model Tube SectionHanger Burner Tube Reflector 1 Reflector, U-Clip and Reflector Support Installation Description Part Number Reflector Support PackageBurner Installation Optional Heater Accessories Tube Heater Assembly Overview Tube Heater Layout Overview Elbow Package Configuration .2.1 Elbow Installation Minimum Distance RequiredBetween Burner and Elbow Elbow Package3 Reflector Joint Installation 2 Elbow Installation4 Reflector Joint Installation 5 Reflector Joint Detail Reflector Joint Detail2 Side Reflector Installation Reflector Side Extension 1 Bracket Installation02712700 Description Part Number Lower Clearance Shield Package 2 Frame Shield Installation Distance a Extension2 Grille End Cap Installation 3 Grille InstallationUnited States Requirements VentingCanadian Requirements Vertical Venting Unvented OperationUnvented Operation Tube Termination Horizontal Ventilation 4 10 cm Pipe Vertical Ventilation 4 10 cm PipeCommon Side Wall Venting TOP ViewCommon Vertical Venting Vertical Outside Air Supply for Single Heater Installation Outside Combustion Air SupplyVertical Outside Air Supply for Double Heater Installation Horizontal Outside Air Supply for Double Heater InstallationGAS Piping Correct Positions Wiring Line Voltage Thermostat WiringLow Voltage Thermostat Wiring Front ViewInternal Wiring Ladder Diagram Electrical Connection to the BurnerOperation and Maintenance Pre-Season Maintenance and Annual InspectionSequence of Operation To Shut Off HeaterPlease see Page 49, .5 for suggested items to inspect Vicinity of the Heater Vehicles and OtherObjects ReflectorBurner Cup and Orifice ElectrodeThermostat Suspension PointsTroubleshooting Troubleshooting Flow Chart 12.1Troubleshooting Manifold Gas Pressure Setting Top View of Heater Natural PropaneReplacement Parts Rear View TOP ViewDescription Part Number General Specifications DimensionsGAS Pressure AT Manifold Pipe ConnectionWarranty is Void if ROBERTS-GORDON LLC will PAY forROBERTS-GORDON LLC will not PAY for Limitations on Authority RepresentativesPage Owner Warranty Registration Card Mail or Fax toPage Page Fire Hazard Keep all flammable objects, liquids and vapors the minimumRequired clearances to combustibles away from heater Heater