York YK M3 M3 G4 operation manual START-UP After Prolonged Shutdown

Page 36
SYSTEM COASTDOWN

period. EPROM version C.02F(T).12 or later pro- vides a 10 minute coastdown period. The compres- sor, condenser water, and cooling tower fans will stop automatically. The oil pump will continue to run for coastdown period. The oil pump will then stop automatically. Once stopped, the

display will be replaced by

SYSTEM READY TO START .

2.Stop the chilled water pump (if not wired into the MicroComputer Control Center, in which case it will shut off automatically simultaneously with the oil pump.) (The actual water pump contact operation is dependent upon the postion of Micro Board jumper J54.)

3.Open the switch to the cooling tower fan motors, if used.

4.The compressor sump oil heater (thermostatically controlled) is energized when the unit is stopped.

PROLONGED SHUTDOWN

If the chiller is to be shut down for an extended period of time (for example, over the winter season), the fol- lowing paragraphs outline the procedure to be followed.

1.Test all system joints for refrigerant leaks with a leak detector. If any leaks are found, they should be repaired before allowing the system to stand for a long period of time.

During long idle periods, the tightness of the sys- tem should be checked periodically.

2.If freezing temperatures are encountered while the system is idle, carefully drain the cooling water from

the cooling tower, condenser, condenser pump, and the chilled water system-chilled water pump and coils.

Open the drains on the cooler and condenser liquid heads to assure complete drainage. (If a Variable Speed Drive, drain its water cooling system. If Solid State Starter. drain water from starter cooling loop.)

3.Move jumper J-57 on the Micro Board from CLOCK ON position (CLKON) to CLOCK OFF position (CLKOFF) while 115VAC control power is applied. This conserves the battery.

4.Open the main disconnect switches to the com- pressor motor, condenser water pump and the chilled water pump. Open the 115 volt circuit to the Control Center.

START-UP AFTER PROLONGED SHUTDOWN

1.When putting the system into operation after pro- longed shutdown (during the winter), remove all oil from the compressor. Install a new filter element and charge compressor with fresh oil. Move jumper J-57 on the Micro Board from CLOCK OFF position (CLKOFF) to CLOCK ON position (CLKON) and re- set the clock. Energize the 115 volt circuit to the Control Center to energize the compressor sump oil heater for at least 12 hours.

2.Operate the Oil Pump (press and release the MAN- UAL OIL PUMP key) until steady oil pressure is established. Then press and release the OIL PUMP key to stop operation of the oil pump. If the water systems were drained, fill the condenser water cir- cuit and chilled liquid circuit.

36

YORK INTERNATIONAL

Image 36
Contents Centrifugal Liquid Chillers With Microcomputer Control CenterTable of Contents Nomenclature Section Description of System and Fundamentals of OperationSystem Operation Description See Fig Detail a Compressor Prerotation Vanes Capacity ControlSection Microcomputer Control Center Microcomputer Control Center and KeypadIntroduction Condenser Refrigerant LevelControl Center OperationDisplaying System Parameters To Display Chilled Liquid Temperatures To Display OIL PressurePsid = HOP LP Offset Pressure To Display Motor Current To Display Operating Hours and Starts CounterSystem Setpoints See Programming System Setpoints, Displaying System Setpoints To Display Undervoltage setpoints Press Access Code key ProgrammingMicrocomputer Control Center Programming System SetpointsElectro-Mechanical Starter, refer to Fig Solid State Starter, refer to FigKeypad Programming Pull Down Demand Setpoint SetpointKeypad Programming Daily Schedule Setpoint Keypad Programming Holiday Service Keys PRE-ROTATION Vanes KeysOther Service Keys Pulldn Level = XXX% Setp = XXX% Actual = XXX%Operating Modes Compressor Switch Display MessagesSystem RUN Auto Vanes System Shutdown Messages When Control Center is in Remote mode MON Xxxx AM Evap Trans or Probe Error Function Jumper Position ThenTherefore MON Xxxx AM High Line Voltage MON Xxxx AM High Speed Drain Temp System Operating Procedures START-UP ProcedureOIL Heaters Checking the OIL Level in the OIL ReservoirSTART-UP Chiller OperationCondenser Water Temperature Control Chiller Starting Sequence & Shutdown SequenceEcwt LchwtChecking Operation Operating LOG SheetOperating Inspections See Section DailyWeekly QuarterlyNeed for Maintenance or Service Normal and Safety System ShutdownsSafety Shutdowns Cycling ShutdownsProlonged Shutdown START-UP After Prolonged ShutdownSystem Components Description System ComponentsGeneral CompressorCompressor Lubrication System See Fig Speed Increasing GearsSchematic Drawing YK Compressor Lubrication System OIL Heater Motor DrivelineHeat Exchangers Refrigerant Flow ControlMicrocomputer Control Center See Section Solid State Starter OptionalVariable Speed Drive Optional Operational Maintenance OIL Return SystemChanging the Dehydrator OIL Charging Procedure OIL ChargeTroubleshooting RiseLEP Operating Setpoints System After Service Operating Analysis Chart Symptom Abnormally LOW Suction PressureSymptom High Cooler Pressure Symptom no OIL Pressure When System Start Button PushedSymptom OIL Pump Vibrates or is Noisy Symptom OIL Pump Fails to Deliver OIL PressureSymptom Reduced OIL Pump Capacity OIL Pressure display keyMaintenance Leak Testing During OperationConducting R-22 Pressure Test Vacuum Testing System PressuresVacuum Dehydration OperationRefrigerant Charging Checking the Refrigerant Charge During Unit ShutdownRefrigerant Charge Handling Refrigerant for Dismantling and Repairs Megging the MotorMotor Stator Temperature and Insulation Resistances Condensers and Coolers Testing for Cooler and Condenser Tube Leaks Compressor Electrical ControlsPreventive Maintenance Pressure TestingCompressor Motor Cooler and CondenserElectrical Controls ALL Rights Reserved

YK M3 M3 G4 THRU YK S6 S4 J2, YK LB LB G4 THRU YK SE SC J4, YK M3 M3 G4 specifications

The York YK M3 M3 G4, YK M3 M3 G4 THRU YK S6 S4 J2, and YK LB LB G4 THRU YK SE SC J4 represent a sophisticated line of HVAC systems engineered for modern commercial applications. These models are celebrated for their innovative designs, energy efficiency, and advanced features, making them a preferred choice among facility managers and building owners.

One of the standout characteristics of the York YK series is its modular construction, which provides unparalleled flexibility in system configuration. This design allows for easy upgrades and expansions as building demands evolve. The YK M3 series, in particular, is equipped with advanced controls that enhance system performance while minimizing energy consumption. With features like variable speed drives and sophisticated control algorithms, these units optimize airflow and refrigerant use, significantly reducing operational costs.

Another notable aspect of the YK M3 M3 G4 is its robust refrigeration technology. Utilizing high-efficiency scroll compressors, these chillers deliver impressive cooling capacities while maintaining high energy efficiency ratings. Integrated with low GWP (Global Warming Potential) refrigerants, they meet modern environmental standards, ensuring compliance with regulations while promoting sustainability.

The YK LB LB G4 and YK SE SC J4 models further enhance York’s portfolio with their compact designs and lower installation footprints. These chillers are ideal for applications where space is at a premium. Additional features include advanced noise reduction technology, allowing for quieter operation compared to traditional HVAC systems, making them suitable for urban environments or buildings where noise control is a priority.

Furthermore, York's commitment to continuous innovation is evident in the incorporation of smart technology across its chiller series. Features such as connectivity options for monitoring and diagnostics through mobile apps or web interfaces empower users to maintain optimal system performance proactively. This connectivity aids in predictive maintenance, enabling timely interventions that extend equipment life and reliability.

Finally, all these high-efficiency chillers are backed by York's renowned service support network, ensuring that customers have access to expert assistance and maintenance services whenever needed. With their exceptional features, modern technologies, and commitment to sustainability, the York YK M3 M3 G4, YK M3 M3 G4 THRU YK S6 S4 J2, and YK LB LB G4 THRU YK SE SC J4 models stand out as leaders in the commercial HVAC market, setting new standards for performance and efficiency.