York YK M3 M3 G4 THRU YK S6 S4 J2, YK LB LB G4 THRU YK SE SC J4 operation manual Megging the Motor

Page 53

FORM 160.49-O2

HANDLING REFRIGERANT FOR

DISMANTLING AND REPAIRS

If it becomes necessary to open any part of the refriger- ant system for repairs, it will be necessary to remove the charge before opening any part of the unit.

MEGGING THE MOTOR

While the main disconnect switch and compressor motor starter are open, meg the motor as follows:

1.Using a megohm meter (megger), meg between phases and each phase to ground (see Fig. 23); these readings are to be interpreted using the graph shown in Fig. 24.

2.If readings fall below shaded area, remove external leads from motor and repeat test.

NOTE: Motor is to be megged with the starter at ambient temperature after 24 hours of idle standby.

LD00475

FIG. 23 – DIAGRAM, MEGGING MOTOR WINDINGS

YORK INTERNATIONAL

53

Image 53
Contents With Microcomputer Control Center Centrifugal Liquid ChillersTable of Contents Nomenclature System Operation Description See Fig SectionDescription of System and Fundamentals of Operation Capacity Control Detail a Compressor Prerotation VanesMicrocomputer Control Center and Keypad Section Microcomputer Control CenterCondenser Refrigerant Level IntroductionDisplaying System Parameters Control CenterOperation Psid = HOP LP Offset Pressure To Display Chilled Liquid TemperaturesTo Display OIL Pressure System Setpoints To Display Motor CurrentTo Display Operating Hours and Starts Counter See Programming System Setpoints, Displaying System Setpoints To Display Undervoltage setpoints Programming Press Access Code keyMicrocomputer Control Center Programming System SetpointsSolid State Starter, refer to Fig Electro-Mechanical Starter, refer to FigSetpoint Keypad Programming Pull Down Demand SetpointKeypad Programming Daily Schedule Setpoint Keypad Programming Holiday PRE-ROTATION Vanes Keys Service KeysPulldn Level = XXX% Setp = XXX% Actual = XXX% Other Service KeysOperating Modes Display Messages Compressor SwitchSystem RUN Auto Vanes System Shutdown Messages When Control Center is in Remote mode MON Xxxx AM Evap Trans or Probe Error Therefore Function Jumper PositionThen MON Xxxx AM High Line Voltage MON Xxxx AM High Speed Drain Temp START-UP Procedure System Operating ProceduresOIL Heaters Checking the OIL Level in the OIL ReservoirChiller Operation START-UPChiller Starting Sequence & Shutdown Sequence Condenser Water Temperature ControlLchwt EcwtChecking Operation Operating LOG SheetDaily Operating Inspections See SectionWeekly QuarterlyNormal and Safety System Shutdowns Need for Maintenance or ServiceSafety Shutdowns Cycling ShutdownsSTART-UP After Prolonged Shutdown Prolonged ShutdownSystem Components System Components DescriptionCompressor GeneralCompressor Lubrication System See Fig Speed Increasing GearsSchematic Drawing YK Compressor Lubrication System Motor Driveline OIL HeaterHeat Exchangers Refrigerant Flow ControlVariable Speed Drive Optional Microcomputer Control Center See SectionSolid State Starter Optional Changing the Dehydrator Operational MaintenanceOIL Return System OIL Charge OIL Charging ProcedureRise TroubleshootingLEP Operating Setpoints System After Service Symptom Abnormally LOW Suction Pressure Operating Analysis ChartSymptom High Cooler Pressure Symptom no OIL Pressure When System Start Button PushedSymptom OIL Pump Fails to Deliver OIL Pressure Symptom OIL Pump Vibrates or is NoisySymptom Reduced OIL Pump Capacity OIL Pressure display keyConducting R-22 Pressure Test MaintenanceLeak Testing During Operation System Pressures Vacuum TestingOperation Vacuum DehydrationRefrigerant Charge Refrigerant ChargingChecking the Refrigerant Charge During Unit Shutdown Megging the Motor Handling Refrigerant for Dismantling and RepairsMotor Stator Temperature and Insulation Resistances Condensers and Coolers Testing for Cooler and Condenser Tube Leaks Electrical Controls CompressorPressure Testing Preventive MaintenanceCompressor Motor Cooler and CondenserElectrical Controls ALL Rights Reserved

YK M3 M3 G4 THRU YK S6 S4 J2, YK LB LB G4 THRU YK SE SC J4, YK M3 M3 G4 specifications

The York YK M3 M3 G4, YK M3 M3 G4 THRU YK S6 S4 J2, and YK LB LB G4 THRU YK SE SC J4 represent a sophisticated line of HVAC systems engineered for modern commercial applications. These models are celebrated for their innovative designs, energy efficiency, and advanced features, making them a preferred choice among facility managers and building owners.

One of the standout characteristics of the York YK series is its modular construction, which provides unparalleled flexibility in system configuration. This design allows for easy upgrades and expansions as building demands evolve. The YK M3 series, in particular, is equipped with advanced controls that enhance system performance while minimizing energy consumption. With features like variable speed drives and sophisticated control algorithms, these units optimize airflow and refrigerant use, significantly reducing operational costs.

Another notable aspect of the YK M3 M3 G4 is its robust refrigeration technology. Utilizing high-efficiency scroll compressors, these chillers deliver impressive cooling capacities while maintaining high energy efficiency ratings. Integrated with low GWP (Global Warming Potential) refrigerants, they meet modern environmental standards, ensuring compliance with regulations while promoting sustainability.

The YK LB LB G4 and YK SE SC J4 models further enhance York’s portfolio with their compact designs and lower installation footprints. These chillers are ideal for applications where space is at a premium. Additional features include advanced noise reduction technology, allowing for quieter operation compared to traditional HVAC systems, making them suitable for urban environments or buildings where noise control is a priority.

Furthermore, York's commitment to continuous innovation is evident in the incorporation of smart technology across its chiller series. Features such as connectivity options for monitoring and diagnostics through mobile apps or web interfaces empower users to maintain optimal system performance proactively. This connectivity aids in predictive maintenance, enabling timely interventions that extend equipment life and reliability.

Finally, all these high-efficiency chillers are backed by York's renowned service support network, ensuring that customers have access to expert assistance and maintenance services whenever needed. With their exceptional features, modern technologies, and commitment to sustainability, the York YK M3 M3 G4, YK M3 M3 G4 THRU YK S6 S4 J2, and YK LB LB G4 THRU YK SE SC J4 models stand out as leaders in the commercial HVAC market, setting new standards for performance and efficiency.