Raypak 751 manual Conventional Combustion Air Supply, Canadian Installations

Page 11

Conventional Combustion Air Supply

U.S. Installations

All Air from Inside the Building

If all combustion air is drawn from the air inside the building (the mechanical equipment room does not receive air from outside):

1.The mechanical equipment room must be provid- ed with two permanent openings communicating directly with additional room(s) of sufficient volume so that the combined volume of all spaces meets the criteria for an unconfined space. (An uncon- fined space is defined as a space whose volume is more than 50 cubic feet per 1,000 BTUH of the aggregate input rating of all appliances installed in that space.)

2.Each opening must have a minimum free area of one (1) square inch per 1,000 BTUH of the total input rating of all gas utilization equipment in the mechanical equipment room.

3.One opening must commence within twelve (12) inches of the top, and one opening must com- mence within twelve (12) inches of the bottom of the room.

4.Refer to NFGC, Part 5, for additional information.

All Air from Outdoors

If all combustion air is drawn from the air outside the building (the mechanical equipment room directly communicates with the outdoors), either of the follow- ing two methods can be used:

Method 1:

1.The mechanical equipment room must be provid- ed with two permanent openings, one commencing within (twelve) 12 inches of the top, and one commencing within twelve (12) inches of the bottom of the room.

2.The openings must communicate directly, or by ducts, with the outdoors.

3.Each opening must have a minimum free area of one (1) square inch per 4,000 BTUH of total input rating of all equipment in the room when the open- ing is communicating directly with the outdoors or

through vertical ducts. The minimum free area required for horizontal ducts is one (1) square inch per 2,000 BTUH of total input rating to all the equipment in the room.

4.Refer to NFGC, Part 5, for additional information. Refer to Appendix A for additional information about combustion air quality.

Method 2 (normally applied in cold climate regions):

1.The mechanical equipment room must be provid- ed with at least one permanent opening, commencing within 12 inches of the top of the enclosure.

2.The opening must communicate directly or by ducts with outdoors.

3.The opening must have a minimum free area of 1 sq. in per 3000 BTUH of the total input rating of all equipment in the room, or no less than the sum of the areas of all vent connectors in the confined space. Refer to the latest version of NFGC, part 5 for additional information.

WARNING: Do not use one permanent opening method (Method 2) if the equipment room is under negative pressure condition or the equipment is common vented with other gas-fired appliances.

Canadian Installations

CAUTION: All combustion air has to be drawn from the air outside the building (the mechanical equipment room directly communicates with the outdoors).

1.Ventilation of the space occupied by the boiler shall be provided by an opening(s) for ventilation air at the highest practical point communicating with outdoors. The total cross-sectional area of such an opening(s) shall be at least 10% of the area required in (2) and (3), but in no case shall the cross-sectional area be less than 10 square inches (6500 square mm).

2.When air supply is provided by natural air flow from the outdoors for natural draft, partial fan assisted, fan-assisted or power draft-assisted burners, there shall be a permanent air supply opening(s) having a cross section area of not less than 1 sq. in. per 7000 BTUH (310 sq. mm per kW) up to and including 1 million BTUH, plus 1 sq. in. per 14000 BTUH (155 sq. mm per kW) in excess

11

Image 11
Contents Advanced Design Boiler Page Contents Pay Attention to These Terms Model Identification Before InstallationInstallations at Elevation Product ReceiptComponent Locations Component LocationsTime/Temperature Relationships in Scalds General SafetyEquipment Base InstallationInstallation Codes Indoor InstallationsDirect Vent Outdoor InstallationsCombustion and Ventilation Air Indoor UnitsInstallations1 Canadian Installations2 Conventional Combustion Air Supply InstallationsCanadian Installations General Low Temperature SystemTemperature & Pressure Gauge Water PipingHydronic Heating Single Boiler Primary/Secondary Piping Dual Boiler Piping Domestic HOT Water Piping Single Boiler Domestic Hot Water with One Storage Tank Page Pool and Spa Water Chemistry Pool HeatingAutomatic Chlorinators and Chemical Feeders Winterizing Your HeaterSingle Boiler Pool Application Double Boiler Pool Application GAS Supply ConnectionsGas Supply Pressure Gas Supply ConnectionElectrical Power Connections Electrical Connections Domestic Hot Water Field Wiring ConnectionsGeneral Definition of Appliance Categories Venting ConnectionsVent Terminal Location Venting Configurations Venting Installation TipsADB-1501 Natural Draft Vertical Vent Termination Natural Draft Vertical Venting System InstallationADB-1501 Horizontal Thru-Wall Direct Venting/Combustion Air Category Horizontal Thru-wall Direct Vent TerminationÁDB-1501 Vertical Direct Venting/Combustion Air Category Vertical Direct Vent Termination Vertical Direct Venting System InstallationContact the manufacturer for details Horizontal Thru-wall Venting System Category IV Installation PVC, ABS Page Galvanized ADB-751 Venting Material e.g Subtract 10 ft per Condensate Trap Alignment Condensate DrainCPW Board Central Point Wiring CPWControls Blower Fan Post-purge Pump Turn-off DelayFreeze Protection Feature Blower Fan Pre-purgeLight Color Indication Diagnostics BoardFigure L-2 Wiring DiagramIgnition Control Module Flow SwitchHigh Limit Manual Reset High Limit Auto ResetFill the System High and Low Gas Pressure Switches Manual ResetPRE-START-UP Low Water Cut Off OptionalBlower T Fitting Detail Pre-Start-up CheckPreparation for Start-up ADB Initial START-UPTools Needed Page Follow-up Main Burner AdjustmentSafety Inspection Post START-UP CheckOperating Instructions MaintenanceSuggested Minimum Maintenance Schedule OperationMonthly Connecting the Condensing Heat Exchanger CHXCleaning Boiler Heating Surfaces DailyConnecting Add-on Condensing Heat Exchanger to ADB Vent Switch AdjustmentInside Combustion Air Contamination AppendixEmissions Settings and Test Information Bluff Head Body Burner Warranty

751 specifications

The Raypak 751 is a high-efficiency, gas-powered pool and spa heater renowned for its advanced technology and durability. Designed with innovative features, the Raypak 751 prioritizes user convenience and energy efficiency, making it an excellent choice for pool owners seeking reliable heating solutions.

One of the standout features of the Raypak 751 is its robust heat exchanger, built from the finest materials to ensure long-lasting performance. This model utilizes a copper heat exchanger which is highly conductive, allowing for rapid heating of water and maintenance of consistent temperatures. Its design also minimizes scale buildup, extending the longevity of the heater.

The Raypak 751 is equipped with advanced digital controls that make it user-friendly. The intuitive interface allows for precise temperature settings and monitoring, ensuring optimal performance. Additionally, the heater features a temperature display that provides real-time updates, giving users peace of mind when adjusting their pool's environment.

Energy efficiency is a hallmark of the Raypak 751, thanks to its low NOx burner technology. This feature meets stringent environmental regulations while also lowering operational costs. By optimizing fuel usage, the heater not only contributes to reducing greenhouse gas emissions but also provides a more economical heating option for pool and spa owners.

The rugged construction of the Raypak 751 is another characteristic that sets it apart. Its heavy-duty cabinet is designed to withstand the elements, ensuring reliable operation in various weather conditions. The heater is available in multiple configurations, including both natural gas and propane options, allowing for flexible installation depending on the user's needs.

Furthermore, the Raypak 751 incorporates safety features, such as an integrated pressure switch that prevents operation when water flow is insufficient. This protects both the heater and associated plumbing from damage due to overheating or dry firing.

In summary, the Raypak 751 combines cutting-edge technology with user-centric features to deliver a superior pool heating experience. Its high-efficiency performance, durable construction, and advanced safety features make it a top choice for anyone looking to enhance their pool or spa. Whether for residential or commercial applications, the Raypak 751 ensures warmth and comfort, enriching the overall swimming experience.