of 1 million BTUH. This opening(s) shall be either located at or ducted to a point neither more than 18 inches (450 mm) nor less than 6 inches (150

mm)above the floor level. The duct can also "Goose Neck" through the roof. The duct is pre- ferred straight down 18 inches from floor, but do not place near piping. This air supply opening requirement shall be in addition to the air opening for ventilation air required in (1).

3.When air supply is provided by natural air flow from outdoors for a power burner and there is no draft regulator, draft hood or similar flue gas dilu- tion device installed in the same space, in addition to the opening for ventilation air required in (1), there shall be a permanent air supply opening(s) having a total cross-sectional area of not less than 1 sq. in. for each 30,000 BTUH (70 sq. mm per kW) of total rated input of the burner(s), and the location of the opening(s) shall not interfere with the intended purpose of the opening(s) for ventila- tion air referred to (1). This opening(s) can be ducted to a point neither more than 18 inches (450

mm)nor less than 6 inches (150 mm) above the floor level. The duct can also "Goose Neck" through the roof. The duct is preferred to be straight down 18 inches from floor, but do not place near piping.

4.Refer to the latest version of CSA B149 for addi- tional information.

WATER PIPING

General

The boiler should be located so that any water leaks will not cause damage to the adjacent area or struc- tures.

All units should be plumbed in accordance with the appropriate diagram from the following sections or per a suitable engineered piping arrangement.

CAUTION: This boiler requires forced water circulation when the burner is operating. See Table E for minimum and maximum flow rates and water pump selection. The pump must be interlocked with the boiler to prevent boiler operation without water circulation.

Relief Valve Piping

WARNING: Pressure relief valve discharge piping must be piped near the floor close to a floor drain to eliminate the potential of severe burns. Do not pipe to any area where freezing could occur. Refer to local codes.

Hydrostatic Test

Unlike many other types of boilers, Raypak boilers do not require hydrostatic testing prior to being placed in operation. The heat exchanger has already been fac- tory-tested and is rated for 160 PSI operating pressure. However, Raypak does recommend hydro- statically testing the piping connections to the boiler and the rest of the system prior to operation. This is particularly true for hydronic systems using expensive glycol-based antifreeze. Raypak recommends con- ducting the hydrostatic test before connecting gas piping or electrical supply.

Leaks must be repaired at once to prevent damage to the boiler. NEVER use petroleum-based stop-leak compounds.

1.Connect fill water supply. Fill boiler with water (be sure bleed valve is open). When water flows from bleed valve, shut off water. Close bleed valve. Carefully fill the rest of the system, being sure to eliminate any entrapped air by using high point vents. Close feed valve. TEST AT standard oper- ating pressure for at least 24 hours.

2.Make sure constant gauge pressure has been maintained throughout test.

3.Check for leaks. Repair if found.

Low Temperature System

Boiler requires minimum inlet temperature of 105°F. Consult the following sections for piping details. (For Pool temperature requirements, See the Pool Heating Section).

Temperature & Pressure Gauge

The temperature and pressure gauge is factory- mounted in the inlet/outlet header.

12

Image 12
Contents Advanced Design Boiler Page Contents Pay Attention to These Terms Before Installation Installations at ElevationProduct Receipt Model IdentificationComponent Locations Component LocationsGeneral Safety Time/Temperature Relationships in ScaldsInstallation Installation CodesIndoor Installations Equipment BaseOutdoor Installations Combustion and Ventilation AirIndoor Units Direct VentInstallations1 Canadian Installations2 Installations Canadian InstallationsConventional Combustion Air Supply Low Temperature System Temperature & Pressure GaugeWater Piping GeneralHydronic Heating Single Boiler Primary/Secondary Piping Dual Boiler Piping Domestic HOT Water Piping Single Boiler Domestic Hot Water with One Storage Tank Page Pool Heating Automatic Chlorinators and Chemical FeedersWinterizing Your Heater Pool and Spa Water ChemistrySingle Boiler Pool Application GAS Supply Connections Double Boiler Pool ApplicationGas Supply Connection Gas Supply PressureElectrical Power Connections Field Wiring Connections Electrical Connections Domestic Hot WaterVenting Connections General Definition of Appliance CategoriesVent Terminal Location Venting Installation Tips Venting ConfigurationsADB-1501 Natural Draft Vertical Venting System Installation Natural Draft Vertical Vent TerminationADB-1501 Horizontal Thru-wall Direct Vent Termination Horizontal Thru-Wall Direct Venting/Combustion Air CategoryÁDB-1501 Vertical Direct Venting/Combustion Air Category Vertical Direct Venting System Installation Vertical Direct Vent TerminationContact the manufacturer for details Horizontal Thru-wall Venting System Category IV Installation PVC, ABS Page Galvanized ADB-751 Venting Material e.g Subtract 10 ft per Condensate Drain Condensate Trap AlignmentCentral Point Wiring CPW ControlsCPW Board Pump Turn-off Delay Freeze Protection FeatureBlower Fan Pre-purge Blower Fan Post-purgeDiagnostics Board Light Color IndicationWiring Diagram Figure L-2Flow Switch High Limit Manual ResetHigh Limit Auto Reset Ignition Control ModuleHigh and Low Gas Pressure Switches Manual Reset PRE-START-UPLow Water Cut Off Optional Fill the SystemPre-Start-up Check Blower T Fitting DetailADB Initial START-UP Tools NeededPreparation for Start-up Page Main Burner Adjustment Safety InspectionPost START-UP Check Follow-upMaintenance Suggested Minimum Maintenance ScheduleOperation Operating InstructionsConnecting the Condensing Heat Exchanger CHX Cleaning Boiler Heating SurfacesDaily MonthlyVent Switch Adjustment Connecting Add-on Condensing Heat Exchanger to ADBAppendix Inside Combustion Air ContaminationEmissions Settings and Test Information Bluff Head Body Burner Warranty

751 specifications

The Raypak 751 is a high-efficiency, gas-powered pool and spa heater renowned for its advanced technology and durability. Designed with innovative features, the Raypak 751 prioritizes user convenience and energy efficiency, making it an excellent choice for pool owners seeking reliable heating solutions.

One of the standout features of the Raypak 751 is its robust heat exchanger, built from the finest materials to ensure long-lasting performance. This model utilizes a copper heat exchanger which is highly conductive, allowing for rapid heating of water and maintenance of consistent temperatures. Its design also minimizes scale buildup, extending the longevity of the heater.

The Raypak 751 is equipped with advanced digital controls that make it user-friendly. The intuitive interface allows for precise temperature settings and monitoring, ensuring optimal performance. Additionally, the heater features a temperature display that provides real-time updates, giving users peace of mind when adjusting their pool's environment.

Energy efficiency is a hallmark of the Raypak 751, thanks to its low NOx burner technology. This feature meets stringent environmental regulations while also lowering operational costs. By optimizing fuel usage, the heater not only contributes to reducing greenhouse gas emissions but also provides a more economical heating option for pool and spa owners.

The rugged construction of the Raypak 751 is another characteristic that sets it apart. Its heavy-duty cabinet is designed to withstand the elements, ensuring reliable operation in various weather conditions. The heater is available in multiple configurations, including both natural gas and propane options, allowing for flexible installation depending on the user's needs.

Furthermore, the Raypak 751 incorporates safety features, such as an integrated pressure switch that prevents operation when water flow is insufficient. This protects both the heater and associated plumbing from damage due to overheating or dry firing.

In summary, the Raypak 751 combines cutting-edge technology with user-centric features to deliver a superior pool heating experience. Its high-efficiency performance, durable construction, and advanced safety features make it a top choice for anyone looking to enhance their pool or spa. Whether for residential or commercial applications, the Raypak 751 ensures warmth and comfort, enriching the overall swimming experience.