Raypak 2600401 operating instructions Electrical Wiring

Page 16

Electrical Wiring

The electrical power supply requirement for these heaters is 120 volts, 60 Hz. Field wiring connections and electrical grounding must comply with the local codes, or in the absence of local codes, with the latest edition of the National Electrical Code, ANSI/NFPA 70. Provide a separate fused circuit from the main electri- cal panel to the heater, and a disconnecting means within sight of the heater.

Remove the control box cover and make the power supply connections in the field wiring compartment. The pump is supplied and factory wired to operate with the heater. The current draw is approximately 2.0 amps. Refer to the heater internal wiring diagrams shown on pages 17 to 21.

NOTE: Minimum 18 AWG, 105°C, stranded wire must be used for all low voltage (less than 30 volts) external connections to the unit. Solid conductors should not be used because they can cause excessive tension on contact points. Install conduit as appropriate. All high voltage wires must be the same size (105°C, stranded wire) as the ones on the unit or larger.

NOTE: If it is necessary to replace any of the original wiring, it must be replaced with 105°C wire or its equivalent, except 150° black wire which must be replaced with 150° wire or its equivalent.

16

Image 16
Contents Econopak Water Heaters Page Contents Are important but not related to personal injury hazards Time/Temperature Relationships in Scalds General SafetyTemperature Time to Produce Serious Burn General Specifications Receiving EquipmentTank Installation Code RequirementsMounting Base ClearancesVenting Connections Outdoor ModelsModels Model No Sq. in. of Each Free AreaIndoor Models Models 0260Vent Max Model No Connector Horizontal Diameter Length ft Vent Terminal/Indoor Stack InstallationCommon Vents Vent Pipe Draft Hood HeaterGas Supply Connections Model No Nat ProGas Pressure Specifications Type Inches WC Regulator Min SettingWater Connections & System Piping Gas Pressure RegulatorRelief Valve 0261 Low NOx WH1 with Pressure Relief ValveElectrical Wiring Wiring Diagrams Standing Pilot ModelIntermittent Ignition Device IID Model Intermittent Ignition Device IID Models 0330 Intermittent Ignition Device IID Model 0261 Low NOx Intermittent Ignition Device IID Models 0331 & 0401 Low NOx Start-up Procedures Servicing ProceduresSequence of Operation Honeywellpilot Robertshaw Pilot For Automatic Ignition Models System Shut Down ProcedureFor Robertshaw Gas Valve Turn gas control Testing the Ignition Safety Shut-off To Turn Off Gas To ApplianceInspection Procedures ControlsLow NOx Heaters-Models BurnersBurner Adjustment High/Low Gas Pressure SwitchOperation Visual InspectionRepair Section Heat Exchanger Removal Heat Exchanger Re-assemblyCombustion Chamber Removal Troubleshooting CausesPiping Electrical Electronic Ignition IID Intermittent Pilot System- Honeywell S8600Electrical Standing Pilot Adjustments & Replacement of Components Circulator Replacement Control Well ReplacementTube Replacement Procedure Procedure for Cleaning Flue Gas Passage WaysLimitedpartswarrantyeconopakwaterheaters Page Page