Raypak 500, 750, 1000 installation instructions Start-Up

Page 60

2.4 Check the Gas Supply Pressure, Location (1)

Leave pilot gas valve and main gas shut-off valve closed;

Slowly turn on main gas shut-off valve;

Read the gas supply pressure from the manometer;

If pressure is > 14" W.C.; Turn off the valve;

Check if the service regulator is installed and/or adjust the service regulator.

2.5Install “Monkey” switch, Location (5)

The “Monkey” switch is a remote on/off switch controlling the first gas valve.

Disconnect the purple/black wire from the black wire on the gas valve

Install remote switch in between using wire nuts

3.0START-UP

3.1Blower Adjustment

1.Turn the “Monkey” switch off

2.Turn power on

3.Check blower manometer reading, Location (4). Compare your reading to the values shown in tables O-2 for natural gas and O-3 for propane, for the appropriate size unit. The reading should be about 2/10” (0.2”) lower. If not, adjust the air shutter on the blower to attain the correct value.

4.Turn power off.

3.2 Pilot Adjustment

1.Turn on the gas shut-off valve;

2.Turn "Monkey" switch off. This will allow pilot to light but not main burner;

3.Turn power on, after 40-45 seconds, ignition control will energize and send spark to ignition, observe through view port for spark;

4.If you do not see spark, turn off power, check ignition wire and proper grounding and wiring. Turn power back on. Repeat Step 1. If there is still no spark after several attempts the igniter may be misaligned.

5.Check to see if igniter is grounded out by pulling the spark wire and doing a continuity check between the igniter and burner. If the igniter is grounded out, it must be realigned. Remove the burner. Loosen the igniter nut, locate the igniter in the center of the burner head and tighten igniter nut. Confirm it is centered and reinstall burner head.

5.If you have spark, turn off unit;

6.Turn on power. Unit will pre-purge 40-45 seconds and to ignition trial. You will hear a click from pilot gas valve (you will not hear the sparking).

7.The pilot may not light at first trial; leave the unit running until you have pilot. If you still do not see pilot over 90 seconds; turn off the unit; repeat step 6.

8.Check pilot manifold pressure, Location (3). Compare the reading to the values listed in tables O-2 and O-3.

9.Check pilot flame; 8 distinct circular blue flames around the center of the pilot.

10.Replace the cap for pilot manifold adjustment screw.

TABLE O-2: PRESSURE SETTINGS FOR NAT. GAS TABLE O-3: PRESSURE SETTINGS FOR PROPANE

Note:For different gas control options, call factory for proper pressure settings (ie; IRI, etc)

60

Image 60
Contents For Your Safety For Your Safety What to do if YOU Smell GASPage Table of Contents Section a Before Installing the Boiler Product ReceiptModelidentification Ratings and CertificationFigure A-1 Advanced Design Boiler Component LocationsSection B Boiler Installation Installation CodesEquipment Base Figure B-1 Outdoor Installation Minimum Clearances Section C Combustion and Ventilation AIR Direct Combustion AIRPage LOW Temperature System Temperature & Pressure GaugeSection D Water Piping General Reliefvalve PipingSection E Hydronic Heating Piping Pump SelectionPressure Drop in Feet of Head Feedwater Regulator Piping Heating BoilersAIR-SEPARATION/EXPANSION Tank THREE-WAY ValvesSingle Boiler PRIMARY/SECONDARY Piping with CHX DUAL-BOILER PRIMARY/SECONDARY PipingFigure E-3b Dual Boiler -PRIMARY/SECONDARY Piping with CHXSection F Domestic HOT Water Piping Single Boiler Domestic HOT Water with ONE Storage TankFigure F-1c Section G Pool Heating Automatic Chlorinators and Chemical FeedersWinterizingyour Heater Spawater Chemistry Single Boiler Pool ApplicationSingle Boiler Pool Application with CHX Figure G-3a Double Boiler Pool ApplicationSection H GAS Supply Connections GAS Supply ConnectionGAS Supply Pressure Regulator Pressure Settings GAS Pressure RegulatorVenting of Diaphragm GAS Components Section I Electrical Power Connections Check the Power SourceCheck Power Source Surge ProtectionField Wiring Connection Making the Electrical ConnectionsElectrical Connections Domestic HOT Water Section J Venting Connections GeneralPage Support of Vent Stack Venting Configurations Figure J-1 Natural Draft Vertical Vent Termination Page Section J-2 Heat Exchanger CategoryPage Section J-3 CategoryPage Section J-4 Vertical Direct Venting/Combustion Air CategoryVertical Direct Venting System Installation Figure J-5 Page Section J-6 Figure J-6Horizontal Thru-wall Venting System Category IV Installation Figure J-7 Page Figure J-8 Page Outdoor Installation withAdd-On Condensing Heat Exchanger Section K Condensate Drain Condensate Trap AlignmentCentral Point Wiring CPW Section L ControlsCPW Board Figure L-1 CPW Board Pump Turn-off Delay Manual High Limit Red Wiring Diagram Figure L-2High Limit Manual Reset Manual Reset High Limit Flow SwitchFlow Switch High Limit Auto Reset Auto Reset High LimitGAS Pressure Switch LOW Water CUT OFF OptionalPressure Control Device ACU-TRACK Section M General Safety Precautions TIME/TEMPERATURE Relationships in ScaldsSection N PRE-START-UP Figure O-1 Component and Pressure TAP LocationsSection O ADB Initial START-UP Tools NeededPreparation for START-UP Do not Turn on GAS AT this Time START-UP Page Section P Post START-UP Check Emissions GuidelinesCO2 Section Q Operation Operating InstructionsTo Turn OFF GAS to Appliance Section R Maintenance Suggested Minimum Maintenance ScheduleCleaning Boiler Heating Surfaces Section S Connecting Condensing Heat Exchanger CHX Vent Switch AdjustmentAppendix a InsidecombustionaircontaminationPage Page Page Page Page START-UP Settings Pressure SettingsLitho in U. S. a
Related manuals
Manual 8 pages 63.38 Kb Manual 8 pages 12.19 Kb

1000, 750, 500 specifications

Raypak is a renowned name in the heating industry, particularly known for its high-quality pool and spa heaters. Among their extensive product line, the Raypak 850, 500, 300, 400, and 700 models stand out for their reliability, efficiency, and cutting-edge technologies. Each model is designed to cater to different needs and applications while maintaining Raypak’s commitment to performance.

The Raypak 850 is designed for larger commercial pools or residential setups requiring high output. With a powerful heat exchanger made from copper and bronze, it ensures superior heat transfer and longevity. Its digital control system provides precise temperature regulation, enhancing user experience. Moreover, it features a durable construction with weather-resistant materials, ensuring lasting performance in various environments.

The Raypak 500 model offers a balance between efficiency and compactness. It features eco-friendly technology that reduces energy consumption without sacrificing performance. The integrated thermostat allows users to maintain consistent water temperatures, making it ideal for residential pools. This model is well-regarded for its user-friendly digital display, simplifying operation and monitoring.

For those needing a more moderate capacity, the Raypak 300 is an efficient choice. It combines robust engineering with an easy-to-use interface. Its advanced ignition system improves reliability while minimizing energy waste. The Raypak 300’s compact design allows for easy installation in various spaces, making it an excellent option for smaller pools.

The Raypak 400 heats water quickly and efficiently, making it suitable for both residential pools and spas. It features a high-capacity heating system that ensures optimal performance. With a clear LED display, users can easily monitor their settings, while the integrated diagnostics provide real-time feedback for maintenance and troubleshooting.

Lastly, the Raypak 700 model is known for its versatility and robust performance. It is equipped with advanced safety features, including a high limit switch and water flow detection mechanism, to ensure safe operation. The model's energy-efficient design enhances its eco-friendliness, making it a popular choice among environmentally conscious users.

Collectively, these Raypak models exemplify superior engineering, performance, and user-friendliness. Their innovative features ensure that they meet the varied demands of pool owners while providing reliable heating solutions for leisure and relaxation. Whether for commercial or residential use, the Raypak 850, 500, 300, 400, and 700 offer unmatched quality and efficiency.