Raypak 0042B, 0066B, 0180B To Turn Off Gas To Boiler, For Honeywell valve, For Robertshaw valve

Page 26
TO TURN OFF GAS TO BOILER

FOR INTERMITTENT IGNITION (IID) WITH HONEY- WELL OR ROBERTSHAW GAS VALVE (All Models)

1.STOP! Read the previous safety information.

2.Set the thermostat to the lowest setting.

3.Turn off all electrical power to the appliance.

4.This boiler is equipped with an ignition device which automatically lights the pilot. Do not try to light the pilot by hand.

GASCONTROL

KNOBSHOWN

IN "ON"

POSITION

GASINLET

Fig. #8201.0

HONEYWELL

(Models 30 - 90)

TO TURN OFF GAS TO BOILER

1.Set the thermostat at the lowest setting.

2.Turn off all electrical power to the boiler if service is to be performed.

3.For Honeywell valve:

Turn gas control knob clockwise

to

"Off". Make sure knob rest against

 

 

 

 

For Robertshaw valve:

 

Push in and move gas control lever to "Off"

 

position.

 

5.For Honeywell valve: Turn gas control knob

clockwise 3.For Honeywell valve: to "Off".

For Robertshaw valve: Push in and move gas control lever to "Off" position.

6.Wait 5 minutes to clear out any gas. Then smell for gas, including near the floor. If you smell gas, STOP! Follow "B" in the safety information on the label affixed to the front of the unit. If you don't smell gas, go to the next step.

7.For Honeywell valve: turn gas control counter-

clockwise For Robertshaw valve: to "On".

For Robertshaw valve: Move gas control lever to "On" position.

GAS CONTROL

KNOB SHOWN

IN "OFF"

POSITION

GAS INLET

Fig. #8199.0

ROBERTSHAW

(All Models)

8.Turn on all electrical power to the boiler.

9.Set thermostat to desired setting.

10.If the boiler will not operate, follow the instructions "To Turn Off Gas To Boiler" and call your service technician or gas supplier.

HONEYWELL PILOT

SHUT-DOWNPROCEDURE

To prevent freeze damage to the heating system, it is recommended that the following system shut-down procedure be performed.

1.Set the room thermostat to "OFF" or the lowest setting.

2.Turn off all electrical switches to the boiler.

3.Turn off all gas valves supplying gas to the boiler. Refer to operating instruction label on the boiler.

4.Shut-off the water supply to the boiler piping system loop.

5.Open drain valve on the boiler to remove water from the boiler and the piping circuits.

Note: It may be necessary to open the purge valves and/ or manual air vents to facilitate complete drainage of water from the heating system.

26

Image 26
Contents 0042B, 0066B,0090B 0135B, 0180B FOR YOUR SAFETYRaythermTM Type H RESIDENTIAL BOILERS Models INSTALLATION AND OPERATING INSTRUCTIONSINSTALLATION PROCEDURES ContentsGENERAL SPECIFICATIONS SERVICING PROCEDURESGENERAL SPECIFICATIONS RECEIVING EQUIPMENTMOUNTING BASE 3. INSTALLATION PROCEDURESCODE REQUIREMENTS CLEARANCEREQUIREMENTSVENTING CONNECTIONS COMMON VENTS VENT DAMPER INSTALLATION Hole in Vent Damper Blade Closed Position VENT DAMPER OPERATION FLAIR DAMPERVENT DAMPER WIRING DIAGRAM WATER CONNECTIONS & SYSTEM PIPING GAS SUPPLY CONNECTIONSGASPRESSURE PIPING DIAGRAMS SINGLE-ZONEPIPINGZONE VALVES HEATINGUNITS ZONE HEATING WITH INDIRECT DOMESTICHOT WATER SUPPLY AIR SCOOP DIAPHRAGM EXPANSION FEED TANK VALVEMULTIPLE ZONES WITH CIRCULATORS MULTIPLE ZONES WITH ZONE VALVESELECTRICAL WIRING WIRING DIAGRAM KEYWIRING DIAGRAMS Page Page WIRING DIAGRAM Dual-ZoneHoneywell Valve WIRING DIAGRAM Single-ZoneTaco ValveWIRING DIAGRAM Dual-ZoneTaco Valve Fig. # 2228eFig. #2232e WIRING DIAGRAM System with 3 Zone PumpsWIRING DIAGRAM: Power Vent System w/ Zone Valve Fig. #2233e Fig. #2234eFig. #2223.2e WIRING DIAGRAM Primary/Secondary Pumping SystemHoneywell Zone Valve Note Low water cut-offLWCO and system switch supplied by others SERVICING PROCEDURES GENERAL LOCATION OF CONTROLSFilling the System START-UPPROCEDURES Lighting the BoilerFor Standing Pilot Models Checking the CirculatorTO TURN OFF GAS TO THE BOILER Models HONEYWELL PILOTROBERTSHAW PILOT FOR AUTOMATIC IGNITION MODELS3.For Honeywell valve SHUT-DOWNPROCEDURETO TURN OFF GAS TO BOILER For Robertshaw valveFOR AUTOMATIC IGNITION SYSTEMS FLAME FAILURE INSPECTION PROCEDURES BURNERSSAFE SHUT-DOWNTESTS LIMIT ACTION INSPECTIONSCHEDULERAYPAK TUBE CLEANING KIT REPAIRPROCEDURESHEAT EXCHANGER RE-ASSEMBLY SOLUTIONS TROUBLESHOOTING GUIDEPROBLEM IMPORTANT NOTICE10Defective ignition module or defective gas valve ADJUSTMENT/REPLACEMENTOF COMPONENTS DANGER - SHOCK HAZARDREPLACEMENT PARTS LIST RAYPAK, INC 2151 Eastman Avenue Oxnard, CAPage Page Page ADDITIONAL WARRANTY EXCLUSIONS LIMITED PARTS WARRANTYHEAT EXCHANGER WARRANTY PARTS REPLACEMENT
Related manuals
Manual 40 pages 10.3 Kb