RECEIVING EQUIPMENT
On receipt of your equipment, visually check for external damage to the carton. If the carton is damaged, it is suggested that a note be made on the Bill of Lading when signing for the equipment. Remove the boiler from the carton, and if it is damaged, report the damage to the carrier immediately. Be sure that you receive the number of packages indicated on the Bill of Lading.
Claims for shortages and damages must be filed with carrier by consignee.
Purchased parts are subject to replacement only under the manufacturer's warranty. Debits for defective replacement parts will not be accepted and defective parts will be replaced in kind only per our standard warranties.
When ordering parts, you must specify Model and Serial Number of boiler. When ordering under warranty conditions, you must also specify date of installation.
Raypak recommends that this manual be re- viewed thoroughly before installing the boiler. If there are any questions which this manual does not answer, please contact your local Raypak repre- sentative.
GENERAL SPECIFICATIONS
Raytherm hydronic boilers are design certified and tested under the requirements of the latest edition of the American National Standard, ANSI Z21.13. Each boiler has been constructed and pressure tested in accordance with the requirements of Section IV of the American Society of Mechanical Engineers Code, and factory fire tested.
The boilers are designed for indoor installation with a
or with intermittent ignition device (I.I.D.). The boilers are equipped with the following components: water circula- tion pump, pressure relief valve, temperature/pressure gauge, adjustable high limit switch, drain valve, fast response temperature sensor, 40 VA transformer, pump relay, vent thermal switch, flame
The automatic ignition models and some standing pilot models are provided with a
Follow the installation instructions furnished with the vent damper package. The
SPECIFICATIONS AND DIMENSIONS