Slant/Fin V-33, V-180 operating instructions Sequence of Operations, Wiring Diagrams

Page 17
Sequence of Operations

VICTORY

17

Sequence of Operations

Wiring Diagrams

THERMOSTAT

CALLS FOR

HEAT

L8148 RELAY (1K)

CLOSES 1K1 AND 1K2

CONTACTS.

CIRCULATOR RUNS.

HIGH

LIMIT NO CONTACTS Wiring Diagrams CLOSED?

YES

INDUCER RELAY (2K)

ENERGIZED. CONTACTS 2K1 CLOSE. INDUCER MOTOR RUNS.

CIRCULATOR CONTINUES TO RUN. NO FURTHER ACTION.

HIGH

NO

 

LIMIT

 

 

CIRCULATOR

CLOSED?

 

 

CONTINUES TO RUN

 

YES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AIR

NO

PROVING

SWITCH CON-

TACTS

CLOSED?

YES

IGNITION CONTROL

ENERGIZED.

SPARK GENERATOR POWERED. FIRST VALVE (PILOT) OPERATOR OPENS.

CIRCULATOR AND INDUCER

CONTINUE TO RUN.

NO FURTHER ACTION

PILOT

FLAME NO

ESTAB-

LISHED?

YES

SPARK GENERATOR OFF. SECOND VALVE OPERATOR (MAIN) OPENS.

MODULE MONITORS PILOT

FLAME.

THERMOSTAT SATISFIED. VALVES CLOSE PILOT AND MAIN BURNERS OFF. INDUCER AND CIRCULATOR OFF.

NATURAL GAS (S8600F)

IGNITION SPARK CONTINUES. PILOT VALVE REMAINS OPEN UNTIL SYSTEM RESET. CIRCULATOR AND INDUCER CONTINUE TO RUN.

L.P. GAS (S8600M)

IGNITION TRIAL CONTINUES FOR 90 SEC. AFTER TRIAL FOR IGNITION, SYSTEM SHUTS OFF. AFTER 5 MIN., MODULE REIN- STATES TRIAL FOR IGNITION.

CAUTION: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. “Verify proper operation after servicing.”

Image 17
Contents HOT WATER MODELS V-33THROUGH VictoryFigure 2. Front View Figure 1. Left End ViewFigure 3. Right End View VICTORYVICTORY INSTALLATION REQUIREMENTSNATURAL GAS FIRED BOILER LOCATION BOILER FOUNDATIONReference Table No VICTORY Figure 4. Vent Sealing InstructionsModel/Vent Size VICTORYRequirements NATURAL DRAFT CHIMNEYALL ITEMS SHOWN BELOW ARE REQUIRED All vent connector joints must be LIQUID tightFigure 6a Horizontal Venting 3 IN. All Victory Models Horizontal Venting 3 IN. All Victory Models VICTORYVICTORY Vertical Venting 3 IN. All Victory ModelsBOILER ROOM AIR SUPPLY AND VENTILATION ELECTRICAL CONTROLS AND WIRINGVICTORY VICTORY SAFETY INFORMATIONOPERATING INSTRUCTIONS, BASIC I. FILLING AND VENTING WATER SYSTEMSVICTORY III. BURNER ADJUSTMENTVICTORY CARE AND MAINTENANCEburners as described on page APPENDIX A VICTORYAPPENDIX B Vent System Location and Condensation Drain RequirementsSequence of Operations Wiring DiagramsOne R-845Aneeded for each circulator Pump Zoning system using R845 RelayCOMBINATION CONTROLS WITH T TV Z TERMINALSGENERAL TROUBLESHOOTING GUIDE FOR SERVICEPEOPLE VICTORY IF REPLACEMENT PARTS ARE NEEDEDPIPING A HEATING - COOLING SYSTEM TO A WATER BOILER AND CHILLER