Slant/Fin V-180, V-33 Victory, Piping A Heating - Cooling System To A Water, Boiler And Chiller

Page 20
PIPING A HEATING - COOLING SYSTEM TO A WATER

20

VICTORY

PIPING A HEATING - COOLING SYSTEM TO A WATER

operate with chiller only, or the boiler only, being valved to the

BOILER AND CHILLER

piping system. Separate control devices on the boiler and

 

chiller may be used, or a single set of air and pressure con-

Figure below illustrates a method of piping a heating-cooling

trols on the common piping may be preferred.

system to a water boiler and a chiller. Hand valves (shown) or

 

automatic valves must be installed to prevent circulation of

If the boiler is used to supply hot water to heating coils in air

chilled water in the boiler or hot water in the chiller.

handling units, flow control valves or other devices must be

 

installed to prevent gravity circulation of water in the coils dur-

The air control system and pressure control system must

ing the cooling cycle.

IF REPLACEMENT PARTS ARE NEEDED

and parts may be obtained locally. All other controls and parts

 

should be identified by and ordered from Slant/Fin. Relief/Safety

When parts are needed, refer to boiler model and serial number

valves must be ASME rated for the pressure and gross output of

shown on the boiler name/rating plate. Refer to publication num-

the boiler.

ber V-10PL Victory Replacement Parts for part numbers. When-

 

ever possible refer to the original order by number

Replacement parts are available from:

and date.

 

 

Slant/Fin Corp.

Control identification and replacement should not be attempted

100 Forest Drive

by unskilled personnel. Only simple, easily-identified controls

Greenvale, NY 11548

SLANT/FIN CORPORATION, Greenvale, N.Y. 11548 • Phone: (516) 484-2600 FAX: (516) 484-5921Canada: Slant/Fin LTD/LTEE, Mississauga,www.slantfinOntar.comio

Image 20
Contents Victory HOT WATER MODELS V-33THROUGHFigure 1. Left End View Figure 2. Front ViewFigure 3. Right End View VICTORYINSTALLATION REQUIREMENTS VICTORYNATURAL GAS FIRED BOILER LOCATION BOILER FOUNDATIONReference Table No Figure 4. Vent Sealing Instructions VICTORYVICTORY Model/Vent SizeRequirements NATURAL DRAFT CHIMNEYALL ITEMS SHOWN BELOW ARE REQUIRED All vent connector joints must be LIQUID tightFigure 6a Horizontal Venting 3 IN. All Victory Models VICTORY Horizontal Venting 3 IN. All Victory ModelsVertical Venting 3 IN. All Victory Models VICTORYBOILER ROOM AIR SUPPLY AND VENTILATION ELECTRICAL CONTROLS AND WIRINGVICTORY SAFETY INFORMATION VICTORYOPERATING INSTRUCTIONS, BASIC I. FILLING AND VENTING WATER SYSTEMSIII. BURNER ADJUSTMENT VICTORYCARE AND MAINTENANCE VICTORYburners as described on page VICTORY APPENDIX AAPPENDIX B Vent System Location and Condensation Drain RequirementsWiring Diagrams Sequence of OperationsPump Zoning system using R845 Relay One R-845Aneeded for each circulatorCOMBINATION CONTROLS WITH T TV Z TERMINALSGENERAL TROUBLESHOOTING GUIDE FOR SERVICEPEOPLE IF REPLACEMENT PARTS ARE NEEDED VICTORYPIPING A HEATING - COOLING SYSTEM TO A WATER BOILER AND CHILLER