Slant/Fin V-33, V-180 operating instructions burners as described on page

Page 15
burners as described on page 13.

VICTORY

15

burners as described on page 13.

*To clean burners run a clean flue brush up the tube until all foreign matter is removed.

IV. SAFETY CHECK FOR CONTROL SYSTEM

1.Remove Control Cover

To remove control cover, remove the two sheet metal screws in the top of the top cover. (See figure 13.) Tilt complete control cover away from boiler and lift up until it clears the bottom angle bracket. To replace the cover, reverse procedure. Be sure that the tab on the bottom of the cover body enters the slot in the bottom angle bracket. CAUTION: The boiler should not be operated with cover off except during certain control checkouts.

2.High Limit Control Test

Set thermostat high enough for boiler water temperature to reach high limit control setting. When this temperature is reached, the high limit switch should open and the main gas valve should close automatically. If the high limit does not operate to close the main gas valve, the valve, the high limit or the wiring is faulty. Repair or replace immediately.

3.Gas Valve Safety Shutdown Test

For boilers equipped with Honeywell S8600 intermittent pilot systems, with main burners firing, disconnect the ignition cable from the S8600 IGNITOR BOX. The gas valve should shut off the main burners.

If the gas valve fails to shut off the main burners when the test is performed, replace the gas valve.

4.Air Flow Pressure Switch Check

With the main burners firing, remove hose from pressure switch, the one toward front of boiler, see figure 14. (Model V-180 has a single sensing hose.) Gas valve should shut off the main burners.

If the main burners do not shut down, shut off the power to the boiler and check for continuity across the pressure switch contacts. If the switch is made when the inducer is not running, replace the pressure switch with one with the exact model number as the existing switch.

If the switch is open and burners do not shut off, replace the ignition control or gas valve.

5.Check for gas leaks from valve and gas piping to burners and pilot. If leaks are found, repair or replace as required.

Figure 13.

Figure 14. Top View of Boiler

V. 1. Providing Protection from Freezing

Anti-freeze is sometimes used in hydronic heating sys- tems to protect against freeze-up in the event of power failure or control shutdown when the building is unoc- cupied. It should be recognized that unless the build- ing is kept above freezing temperature by some means, the plumbing system is not protected.

Two types of anti-freeze may be used: ETHYLENE GLYCOL, used in automobiles, has desirable proper- ties, but is toxic. Its use may be prohibited when sys- tem water/glycol solution is in contact with a potable water vessel (as with a tankless heater). PROPYLENE GLYCOL is used in the quick-freeze food industry; it is practically non-toxic. Its use may be permitted when tankless heaters are used. When anti-freeze must be used, inhibited propylene glycol is recommended. Useful information on the characteristics, mixing pro- portions, etc. of glycol in heating systems is given in Technical Topics No. 2A, available from the Hydronics Institute, 34 Russo Place, Berkeley Heights, NJ 07922. Consult glycol manufacturers for sources of propylene glycol.

2.Water Treatment

A good water treatment program will not only extend the useful life of this boiler but it will also save much of the time and expense of repairs made necessary by preventable occurrences.

A reputable water treatment company should be con- sulted to evaluate and determine the best overall treat- ment program for your boiler equipment.

VI. KEEP THE BOILER AREA CLEAR AND FREE FROM COMBUSTIBLE MATERIALS, GASOLINE, AND OTHER FLAMMABLE VAPORS AND LIQUIDS.

BOILER WATER CONTENT

Model

Pounds

Gallons

 

V-33

17.50

2.1

 

V-60

24.75

3.0

 

V-90

32.00

3.8

 

V-120

39.25

4.7

 

V-150

46.50

5.6

 

 

 

 

 

*For service remove ONLY these two screws. DO NOT remove any other screws.

Image 15
Contents HOT WATER MODELS V-33THROUGH VictoryVICTORY Figure 1. Left End ViewFigure 2. Front View Figure 3. Right End ViewBOILER FOUNDATION INSTALLATION REQUIREMENTSVICTORY NATURAL GAS FIRED BOILER LOCATIONReference Table No VICTORY Figure 4. Vent Sealing InstructionsNATURAL DRAFT CHIMNEY VICTORYModel/Vent Size RequirementsAll vent connector joints must be LIQUID tight Figure 6aALL ITEMS SHOWN BELOW ARE REQUIRED Horizontal Venting 3 IN. All Victory Models Horizontal Venting 3 IN. All Victory Models VICTORYVICTORY Vertical Venting 3 IN. All Victory ModelsELECTRICAL CONTROLS AND WIRING VICTORYBOILER ROOM AIR SUPPLY AND VENTILATION I. FILLING AND VENTING WATER SYSTEMS SAFETY INFORMATIONVICTORY OPERATING INSTRUCTIONS, BASICVICTORY III. BURNER ADJUSTMENTVICTORY CARE AND MAINTENANCEburners as described on page Drain Requirements VICTORYAPPENDIX A APPENDIX B Vent System Location and CondensationSequence of Operations Wiring DiagramsTERMINALS Pump Zoning system using R845 RelayOne R-845Aneeded for each circulator COMBINATION CONTROLS WITH T TV ZGENERAL TROUBLESHOOTING GUIDE FOR SERVICEPEOPLE BOILER AND CHILLER IF REPLACEMENT PARTS ARE NEEDEDVICTORY PIPING A HEATING - COOLING SYSTEM TO A WATER