Slant/Fin V-180, V-33 operating instructions Left End View, Front View, Right End View, Victory

Page 2
Image 2
Contents Victory HOT WATER MODELS V-33THROUGHFigure 3. Right End View Figure 1. Left End ViewFigure 2. Front View VICTORYNATURAL GAS FIRED BOILER LOCATION INSTALLATION REQUIREMENTSVICTORY BOILER FOUNDATIONReference Table No Figure 4. Vent Sealing Instructions VICTORYRequirements VICTORYModel/Vent Size NATURAL DRAFT CHIMNEYALL ITEMS SHOWN BELOW ARE REQUIRED All vent connector joints must be LIQUID tightFigure 6a Horizontal Venting 3 IN. All Victory Models VICTORY Horizontal Venting 3 IN. All Victory ModelsVertical Venting 3 IN. All Victory Models VICTORYBOILER ROOM AIR SUPPLY AND VENTILATION ELECTRICAL CONTROLS AND WIRINGVICTORY OPERATING INSTRUCTIONS, BASIC SAFETY INFORMATIONVICTORY I. FILLING AND VENTING WATER SYSTEMSIII. BURNER ADJUSTMENT VICTORYCARE AND MAINTENANCE VICTORYburners as described on page APPENDIX B Vent System Location and Condensation VICTORYAPPENDIX A Drain RequirementsWiring Diagrams Sequence of OperationsCOMBINATION CONTROLS WITH T TV Z Pump Zoning system using R845 RelayOne R-845Aneeded for each circulator TERMINALSGENERAL TROUBLESHOOTING GUIDE FOR SERVICEPEOPLE PIPING A HEATING - COOLING SYSTEM TO A WATER IF REPLACEMENT PARTS ARE NEEDEDVICTORY BOILER AND CHILLER