Slant/Fin V-180 operating instructions Victory, HOT WATER MODELS V-33THROUGH

Page 1
Victory™

Victory

HOT WATER MODELS V-33 THROUGH V-180

GAS-FIRED CAST-IRON BOILERS FOR NATURAL AND L.P. PROPANE GASES

CONTENTS

PAGE

Ratings and Dimensions

. . . .2

Installation Requirements:

 

Boiler Location

. . . .3

Boiler Foundation

. . . .3

Minimum Clearance

. . . .3

Venting Requirements

. . . .3

Chimney and Type “B” Venting

. . . .4

Horizontal Venting

. . . .5

Vertical Venting

. . . .6

Regular Inspection

. . . .6

Gas Piping

. . . .6

Electrical Controls and Wiring

. . .11

Boiler Room Air Supply and Ventilation

. . .11

Water Piping

. . .11

Operating Instructions:

 

Filling and Venting Water Systems

. . .12

Initial Start, Safety and Lighting Instructions

. . .12

IID System with Honeywell VR8204 or VR8304

. . .12

Burner Adjustment, Checking Gas Input

. . .13

Care and Maintenance:

 

General Maintenance

. . .14

Water Level Check

. . .14

Annual Inspection and Cleaning

. . .14

Safety Check for Control Systems

. . .15

Protection from Freezing

. . .15

Water Treatment

. . .15

Appendix A and B

. . .16

Sequence of Operations

. . .17

Wiring Diagrams

. . .17

Pump or Valve Zoning of Water Boilers

. . .18

General Troubleshooting Guide

. . .19

Piping a Heating-Cooling System

. . .20

Replacement Parts

. . .20

READ ALLIMPOROF THEANTFOLLOWING WARNINGS AND STATEMENTS BEFORE READING THE INSTALLATION INSTRUCTIONS

WARNING

LIQUEFIED PETROLEUM (L.P.)

PROPANE FIRED GAS BOILERS

Installation location ONLY as permitted in paragraph entitled "LIQUEFIED PETROLEUM (L.P.) PROPANE GAS FIRED BOILER LOCATION" on page 3 of this

instruction book.NATURAL

The above warning does not apply togas fired boilers.

The installation must conform to the requirements of the authority having jurisdiction or, in the absence of such requirements, to the National Fuel Gas Code, ANSI Z223.1-latest edition. The installation must also conform to the additional requirements in this Slant/Fin Instruction Book.

In addition where required by the authority having juris- diction, the installation must conform to American Soci- ety of Mechanical Engineers Safety Code for Controls and Safety Devices for Automatically Fired Boilers. No. CSD-1.

This manual must be left with owner and should be hung on or adjacent to the boiler for reference.

WARNING

This boiler, gas piping and accessories must be installed, connected, serviced and repaired by a trained, experienced service technician, familiar with all precautions required for gas fired equipment and licensed or otherwise qualified, in compliance with the authority having jurisdiction.

Printed in U.S.A. 301

Publication No.V-40

Part No. 44-0596

Rev. M

Image 1
Contents HOT WATER MODELS V-33THROUGH VictoryFigure 2. Front View Figure 1. Left End ViewFigure 3. Right End View VICTORYVICTORY INSTALLATION REQUIREMENTSNATURAL GAS FIRED BOILER LOCATION BOILER FOUNDATIONReference Table No VICTORY Figure 4. Vent Sealing InstructionsModel/Vent Size VICTORYRequirements NATURAL DRAFT CHIMNEYFigure 6a All vent connector joints must be LIQUID tightALL ITEMS SHOWN BELOW ARE REQUIRED Horizontal Venting 3 IN. All Victory Models Horizontal Venting 3 IN. All Victory Models VICTORYVICTORY Vertical Venting 3 IN. All Victory ModelsVICTORY ELECTRICAL CONTROLS AND WIRINGBOILER ROOM AIR SUPPLY AND VENTILATION VICTORY SAFETY INFORMATIONOPERATING INSTRUCTIONS, BASIC I. FILLING AND VENTING WATER SYSTEMSVICTORY III. BURNER ADJUSTMENTVICTORY CARE AND MAINTENANCEburners as described on page APPENDIX A VICTORYAPPENDIX B Vent System Location and Condensation Drain RequirementsSequence of Operations Wiring DiagramsOne R-845Aneeded for each circulator Pump Zoning system using R845 RelayCOMBINATION CONTROLS WITH T TV Z TERMINALSGENERAL TROUBLESHOOTING GUIDE FOR SERVICEPEOPLE VICTORY IF REPLACEMENT PARTS ARE NEEDEDPIPING A HEATING - COOLING SYSTEM TO A WATER BOILER AND CHILLER