Slant/Fin V-33, V-180 operating instructions Vent Sealing Instructions, Victory

Page 5
Image 5
Contents HOT WATER MODELS V-33THROUGH VictoryFigure 2. Front View Figure 1. Left End ViewFigure 3. Right End View VICTORYVICTORY INSTALLATION REQUIREMENTSNATURAL GAS FIRED BOILER LOCATION BOILER FOUNDATIONReference Table No VICTORY Figure 4. Vent Sealing InstructionsModel/Vent Size VICTORYRequirements NATURAL DRAFT CHIMNEYALL ITEMS SHOWN BELOW ARE REQUIRED All vent connector joints must be LIQUID tightFigure 6a Horizontal Venting 3 IN. All Victory Models Horizontal Venting 3 IN. All Victory Models VICTORYVICTORY Vertical Venting 3 IN. All Victory ModelsBOILER ROOM AIR SUPPLY AND VENTILATION ELECTRICAL CONTROLS AND WIRINGVICTORY VICTORY SAFETY INFORMATIONOPERATING INSTRUCTIONS, BASIC I. FILLING AND VENTING WATER SYSTEMSVICTORY III. BURNER ADJUSTMENTVICTORY CARE AND MAINTENANCEburners as described on page APPENDIX A VICTORYAPPENDIX B Vent System Location and Condensation Drain RequirementsSequence of Operations Wiring DiagramsOne R-845Aneeded for each circulator Pump Zoning system using R845 RelayCOMBINATION CONTROLS WITH T TV Z TERMINALSGENERAL TROUBLESHOOTING GUIDE FOR SERVICEPEOPLE VICTORY IF REPLACEMENT PARTS ARE NEEDEDPIPING A HEATING - COOLING SYSTEM TO A WATER BOILER AND CHILLER