Slant/Fin VSPH-60 Venting Installation, Sidewall Venting NON-DIRECT Vent, Sidewall Direct Venting

Page 8

8

VICTORY VSPH Models

VENTING INSTALLATION

Follow the vent material manufacturer’s instructions in con- junction with these instructions for venting system installa- tion.

I.Non-Direct Vent Installation

The air for combustion is taken from the ambient air sur- rounding the boiler; therefore, ample supply of air is required for combustion and ventilation (see page 5.)

DO NOT use this installation method if the surrounding of the boiler is contaminated. The harmful corrosive contamination may be from the chlorine-type detergents, cleaners, bleach- es, and fabric softeners used in laundry or chlorine-based swimming pool chemicals.

A. SIDEWALL VENTING - NON-DIRECT VENT

Figures 5 and 6 show typical horizontal sidewall venting. For combustible wall passage of vent piping, a UL listed thimble must be used, providing the wall thickness from 3" minimum up to 12" maximum. The vent piping must terminate with a screened tee or elbow termination facing down.

CAUTION: Flue gasses exiting from the vent terminal will condense. Building materials in the area of the vent terminal should be protected from discoloration and degradation.

VENT TERMINATION LOCATION AND CLEARANCES

1.The venting system shall terminate at least 3 feet above any forced air inlet located within 10 feet.

2.The venting system shall terminate at least 4 feet below,

4 feet horizontally from, or 1 foot above any door, window or gravity air inlet into any building. The bottom of the vent terminal or air intake terminal shall be at least 12 inches above grade or the normal snow level whichever is greater.

3.Through the wall vents shall not terminate over public walkways or over areas where condensate or vapor could create a nuisance or hazard or could be detrimental to the operation of regulators, relief valves or other equip- ment. Minimum clearance of 4 feet horizontal distance is maintained, from electric meters, gas meters, regulators and relief equipment.

4.Vent termination must not be located in any confined space (i.e. window wells, alcoves, narrow alleys) or under any overhang or deck. Vent termination should not allow flue gas discharge towards neighbor’s windows or where personal injury or property damages can occur.

B. NON-DIRECT VENT - VERTICAL VENTING

Figure 7 shows typical venting through the roof. The vent pipe must pass through the ceiling, floor and the roof verti- cally through a 7" minimum diameter cutout. A fire stop is required for each ceiling and floor penetration. For roof pas-

sage, an appropriate UL listed roof flashing must be used.

An existing chimney (see Figure 8) may be used as a chase for vertical venting. Other appliances CANNOT be vented into the same chimney or vent pipe with in the chimney.

The vertical vent piping must terminate with a screened tee, combination of 45˚ elbow and a 90˚ screened elbow termina- tion or a rain cap termination.

II. Direct Vent Installation

Air intake piping from outside to the boiler air intake collar provides the air for combustion. The boiler surrounding may be contaminated with chlorine-based products such as laun- dry detergents.

A. SIDEWALL DIRECT VENTING

Figures 9 and 10 show typical sidewall direct venting. Slant/Fin vent/air intake termination MUST be used for this method of installation.

CAUTION: Flue gasses existing from the vent terminal will condense. Building materials in the area of the terminal should be protected from discoloration and degradation. See page 8 for vent termination location and required clearances.

VENT/AIR INTAKE TERMINATION INSTALLATION

1.Termination must be installed horizontally.

2.Refer to Figure 11 for installation details.

3.Wall thickness should be 3" to 12" thick

4.Follow instruction for “vent termination location and clearances” explained on this page

5.Cut a rectangular opening with following dimensions in the wall.

Height: 514"

Width: 1234"

6.From outside of the wall, install outside termination plate using 4 screws. Make sure the louvers are at left side.

7.For combustible wall a 4" galvanized pipe must be used as a wall thimble.

The length of the 4" galvanized pipe should be approximately 1" shorter than the wall thickness.

8.From inside the building, fit galvanized pipe over 4" collar of the outside plate.

9.From inside, fit 3" diameter air intake pipe over 3" collar located on the air box of the outside plate.

(text continued p.13)

Image 8
Contents Table of Contents Victory VsphBoiler Input No. Model Btuh Sections Ratings and DimensionsVictory Vsph Models Base Assembly Location and Identification of PartsSafety Natural GAS-FIRED Boiler LocationLiquefied Petroleum L.P. Propane GAS-FIRED Boiler Location Boiler FoundationNON-DIRECT Vent Installation Direct Vent InstallationVenting Application Boiler Room AIR Supply and VentilationAIR Intake Pipe Material Flue and AIR Intake Restrictions000 Ft 000 7,500 Ft 500 10,000 Ft Venting Installation VENT/AIR Intake Termination InstallationSidewall Venting NON-DIRECT Vent Vent Termination Location and ClearancesVictory Vsph Models NON Direct VENT, Sidewall Venting Non-direct vent, side wall ventingAL 29-4C is a Registered Trademark of Allegheny Ludlum Corp Victory Vsph Models Victory Vsph Models Direct VENT, Sidewall Venting Direct Vent Venting and AIR Intake Through a Roof Vent/Air Intake TerminationVictory Vsph Models Direct VENT, Venting and AIR Intake Through a RoofElectrical Wiring Power SupplyVenting and AIR Intake System Regular Inspection GAS PipingSchematic wiring diagram Multizoning of Vsph Boiler Water Piping Thermostat ConnectionsMulti Zoning Operating Instructions Safety Information Vsph Boiler Sequence of Operation Normal Operation Status of Indicator Lights LED’S Description of Operation Power TSTAT/CIRC LEDLimit Press Switch Flame LED Integrated Boiler ControlIndication Remedy Diagnostic Flash CodesLED’s Flashing Care and Maintenance General MaintenanceCleaning II. Inspection During Heating SeasonGeneral Troubleshooting Guide For Service Personnel Burners Fail to OPERATE- no Heat CauseNot Enough Heat Cause Burner will not Shut OFF CauseFumes and GAS Odors Cause Remedy If Replacement Parts are NeededBurner Short Cycles Cause Remedy SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516

VSPH-180, VSPH-60 specifications

Slant/Fin is a renowned name in the heating industry, renowned for its innovation, quality, and efficiency. Among its popular offerings are the VSPH-180 and VSPH-60, two highly efficient gas-fired residential boilers designed to provide reliable heating for homes.

The VSPH-180 is a high-efficiency residential boiler that delivers exceptional heating performance while being mindful of energy consumption. It operates at an impressive AFUE (Annual Fuel Utilization Efficiency) rating of up to 95%, meaning it uses 95% of the fuel burned for heating, resulting in lower energy bills and reduced environmental impact. The VSPH-180 features a durable stainless steel heat exchanger that not only contributes to its efficiency but also prolongs the boiler's lifespan.

On the other hand, the VSPH-60 is a slightly smaller but equally efficient model that is perfect for apartments or smaller homes. It also boasts a remarkable AFUE rating of up to 95%, ensuring cost-effective heating solutions. The compact design of the VSPH-60 allows for easy installation in various locations, making it a versatile choice for homeowners seeking space-saving options without compromising on performance.

One of the standout technologies in both models is the modulating gas valve, which adjusts the burner’s output to match the heating demand. This feature enhances energy efficiency by preventing the boiler from working harder than necessary, ensuring consistent temperatures and reducing wear on the unit. Furthermore, both models are equipped with a built-in electronic ignition system, eliminating the need for a pilot light and adding convenience for homeowners.

The VSPH series is designed with maintenance ease in mind. It features a user-friendly control panel that provides easy access to critical information, allowing for straightforward diagnostics and service. Regular maintenance can be performed with minimal disruption, enabling owners to keep their systems running optimally throughout the heating season.

In conclusion, the Slant/Fin VSPH-180 and VSPH-60 represent excellence in residential heating technology. With high AFUE ratings, durable construction, and advanced features, both boilers provide efficient and reliable heating solutions, ensuring comfort and energy savings for homeowners.