Slant/Fin VSPH-180, VSPH-60 Diagnostic Flash Codes, LED’s Flashing, Indication Remedy

Page 23

VICTORY VSPH Models

23

 

 

 

B. DIAGNOSTIC FLASH CODES

Flashing LED’s provide diagnostic information

WARNING: Only a trained, experienced service technician should perform troubleshooting. Turn off all electric power to the boiler before service

 

 

LED’s FLASHING

INDICATION

REMEDY

 

 

POWER LED *

120 V power supply. Polarity is reversed

Reverse Hot and NEUTRAL wires in the junction

 

 

 

 

box.

 

 

POWER + TSTAT/CIRC LED’S *

48 VAC on thermostat circuit.

Check and correct the thermostat or zone valves

 

 

 

 

wirings.

 

 

POWER + PRES SWITCH LED’S *

Pressure switch contacts are closed prior to

Check air pressure switch.

 

 

 

energizing the blower motor or does not close

Check hose connections to pressure switch.

 

 

 

within 5 minutes of the blower being turned on.

Check for obstruction/restriction in venting, air

 

 

 

 

intake piping and termination.

 

 

POWER + FLAME LED’S *

Flame sensed without call for heat.

Remove air box front panel.

 

 

 

 

Turn off power for at least 45 seconds.

 

 

 

 

Check if pilot flame exists during pre-purge

 

 

 

 

period (first 30 seconds). If pilot flame exists,

 

 

 

 

replace gas valve

 

 

FLAME LED *

Pilot flame was not established during trial for

Check gas valve knob to be in “ON” position.

 

 

 

ignition.

Check inlet gas pressure.

 

 

 

 

Check pilot gas line.

 

 

 

 

Check ignition cable and the connections.

 

 

 

 

Check pilot flame to be 3/8” to 1/2" long

 

 

 

 

 

 

 

PRES SWITCH LED

Pressure switch opened during boiler run

Check pressure switch and its hoses.

 

 

 

period. Wind gusts over 40 mph.

Check for obstruction in venting, air intake

 

 

 

 

piping and termination.

 

 

 

 

 

 

* Control Lockout

 

 

To reset the lockout condition: Turn down thermostat or turn power off at disconnect switch for at least 45 seconds, then restore power or set thermostat at desired setting.

Automatic reset: After one hour (1/2 hour for flame failure), control will automatically retry.

Flame LED (Red)

Pressure Switch LED (Red)

Hi Limit LED (Red)

Thermostat/Circ. LED (Red)

Power LED (Green)

Figure 20. Integrated boiler control.

SAFETY CHECK

1.Checking for gas leaks:

Using soap solution, check for gas leaks from meter to gas valve including all pipes and fittings, gas valve con- nections, manifold and pilot burner gas line and its fittings. Use liquid soap solution for all gas testing. DO NOT use open flame.

2.High limit control (Aquastat) test:

Set room thermostat high enough for boiler water temper- ature to reach high limit setting. When this temperature is reached, the high limit switch should open. Pilot and main gas valve should close. Inducer starts 15 seconds post- purge period. POWER and TSTAT/CIRC LED’s will stay on.

3.Thermostat test:

Set thermostat setting to low enough to end call for heat. Pilot and main gas valve should close circulator off and inducer will start 15 seconds post-purge. POWER LIMIT and PRESS SWITCH LED’s will stay on during post- purge. After the post-purge period, POWER and LIMIT LED’s stay on.

4.Control safety shutdown test:

With main burners firing (all LED’s on) disconnect igni- tion/sensor cable from boiler control. Gas valve should shut off burners, FLAME LED starts flashing.

5.Pressure switch test:

With burners firing, remove plastic hoses from pressure switch or from aluminum tubing (see Figure 21), gas valve must shut off, PRESS SWITCH LED starts flashing.

Image 23
Contents Victory Vsph Table of ContentsBoiler Input No. Model Btuh Sections Ratings and DimensionsVictory Vsph Models Location and Identification of Parts Base AssemblyBoiler Foundation SafetyNatural GAS-FIRED Boiler Location Liquefied Petroleum L.P. Propane GAS-FIRED Boiler LocationBoiler Room AIR Supply and Ventilation NON-DIRECT Vent InstallationDirect Vent Installation Venting ApplicationFlue and AIR Intake Restrictions AIR Intake Pipe Material000 Ft 000 7,500 Ft 500 10,000 Ft Vent Termination Location and Clearances Venting InstallationVENT/AIR Intake Termination Installation Sidewall Venting NON-DIRECT VentNon-direct vent, side wall venting Victory Vsph Models NON Direct VENT, Sidewall VentingAL 29-4C is a Registered Trademark of Allegheny Ludlum Corp Victory Vsph Models Victory Vsph Models Direct VENT, Sidewall Venting Vent/Air Intake Termination Direct Vent Venting and AIR Intake Through a RoofDirect VENT, Venting and AIR Intake Through a Roof Victory Vsph ModelsGAS Piping Electrical WiringPower Supply Venting and AIR Intake System Regular InspectionSchematic wiring diagram Multizoning of Vsph Boiler Water Piping Thermostat ConnectionsMulti Zoning Operating Instructions Safety Information Vsph Boiler Sequence of Operation Integrated Boiler Control Normal Operation Status of Indicator Lights LED’SDescription of Operation Power TSTAT/CIRC LED Limit Press Switch Flame LEDIndication Remedy Diagnostic Flash CodesLED’s Flashing II. Inspection During Heating Season Care and MaintenanceGeneral Maintenance CleaningBurners Fail to OPERATE- no Heat Cause General Troubleshooting Guide For Service PersonnelBurner will not Shut OFF Cause Not Enough Heat CauseFumes and GAS Odors Cause Remedy If Replacement Parts are NeededBurner Short Cycles Cause Remedy SLANT/FIN CORPORATION, Greenvale, N.Y Phone 516

VSPH-180, VSPH-60 specifications

Slant/Fin is a renowned name in the heating industry, renowned for its innovation, quality, and efficiency. Among its popular offerings are the VSPH-180 and VSPH-60, two highly efficient gas-fired residential boilers designed to provide reliable heating for homes.

The VSPH-180 is a high-efficiency residential boiler that delivers exceptional heating performance while being mindful of energy consumption. It operates at an impressive AFUE (Annual Fuel Utilization Efficiency) rating of up to 95%, meaning it uses 95% of the fuel burned for heating, resulting in lower energy bills and reduced environmental impact. The VSPH-180 features a durable stainless steel heat exchanger that not only contributes to its efficiency but also prolongs the boiler's lifespan.

On the other hand, the VSPH-60 is a slightly smaller but equally efficient model that is perfect for apartments or smaller homes. It also boasts a remarkable AFUE rating of up to 95%, ensuring cost-effective heating solutions. The compact design of the VSPH-60 allows for easy installation in various locations, making it a versatile choice for homeowners seeking space-saving options without compromising on performance.

One of the standout technologies in both models is the modulating gas valve, which adjusts the burner’s output to match the heating demand. This feature enhances energy efficiency by preventing the boiler from working harder than necessary, ensuring consistent temperatures and reducing wear on the unit. Furthermore, both models are equipped with a built-in electronic ignition system, eliminating the need for a pilot light and adding convenience for homeowners.

The VSPH series is designed with maintenance ease in mind. It features a user-friendly control panel that provides easy access to critical information, allowing for straightforward diagnostics and service. Regular maintenance can be performed with minimal disruption, enabling owners to keep their systems running optimally throughout the heating season.

In conclusion, the Slant/Fin VSPH-180 and VSPH-60 represent excellence in residential heating technology. With high AFUE ratings, durable construction, and advanced features, both boilers provide efficient and reliable heating solutions, ensuring comfort and energy savings for homeowners.