6.0Install Termination
6.1Slide the termination body onto the cable and remove core. Make sure the termination body (not the core) is butted
up to the edge of the vinyl tape marker previously applied (Figure 7). Pull the core while unwinding, counter- clockwise, starting with the loose end (Figure 7). Be sure to alternate the pulling and unwinding actions (pull-
NOTE: Once the termination body makes contact over the mastic seal area, there is no need to continue supporting the assembly. Do not push or pull on the termination assembly while unwinding the core.
Counterclockwise
Vinyl Tape Marker | NOTE: The material being removed at this step is mixed polymers |
| and can be recycled. |
Figure 7
6.2Connect ground braid to system ground according to standard practice.
Correct Installation of Termination on Tape Shielded Cable |
| |
Vinyl Tape |
|
|
Marker | Ridge at End of Cable |
|
|
| |
| Insulation Shield |
|
Ridge at End |
|
|
of |
|
|
Cable Insulation | Environmental Top | |
Stress Controlling Compound | Conductor | Seal |
| ||
|
| |
|
| Relief Tube |
6 |
|