Kohler K-683, K-684, K-686, K-685 manual Preparation

Page 5
1. Preparation

30' (9.14 m) 4-Pin Interface Cable

Auxiliary Interface

 

 

(Outside Shower)

Primary Interface

(Inside Shower)

Drip Loop

Power Supply

Connector

Drip Loop

Outlet

30' (9.14 m) 8-Pin Interface Cable

Drip Loop

Drip Loops

1. Preparation

If not already installed, install the digital valve at this time according to the instructions packed with the product.

NOTE: The optional auxillary interface, with the 4-pin cable, is located outside the showering enclosure, while the primary interface, with the 8-pin cable, is located inside the showering enclosure.

Determine all required components along with their installation locations before beginning this installation.

Custom showering experiences other than the preprogrammed options must be programmed into the interface prior to use. Refer to the ″Digital Interface Homeowners Guide.″

NOTE: The 8-pin cable is used for the primary interface and the 4-pin for the auxillary interface.

Verify that both the primary and auxillary interface are located so the interface cable easily spans the distance between the valve and interface connection.

Kohler Co.

5

1043184-2-B

Image 5
Contents Digital Interface Installation GuideSpecifications IMPORTANT INSTRUCTIONSPlus Thank You For Choosing Kohler CompanyTools and Materials 1/2 1.3 cm Min Clamp Arm Clearance Roughing-In Before You BeginClamp Arm Cutout1. Preparation Cutout Interface lip 1/4 6 mm 2. Prepare the Site7-11/16 19.5 cm 3-11/16 9.4 cm 52 132.1 cm3. Install the Interface Kohler Co Install the Interface cont1043184-2-B 5. Installation Checkout 4. Complete the InstallationKohler Co 1043184-2-BInstallation Checkout cont 6. TroubleshootingTroubleshooting Table Troubleshooting contTroubleshooting Table Troubleshooting contRenseignements importants Guide d’installationInterface digitale SpécificationsPlus Merci d’avoir choisi la compagnie KohlerOutils et matériels Dégagement minimum du bras de la pince 1/2 1,3 cm Raccordement Avant de commencerDécoupe Bras de la pince1. Préparation Lèvre de 2. Préparer le sitelinterface 1/4 6 mmAnneau 3. Installer l’interface45,7 cm découlementKohler Co Installer l’interface contFrançais-7 1043184-2-B5. Vérification de l’installation 4. Compléter l’installation1043184-2-B Français-86. Dépannage Vérification de l’installation cont1043184-2-B Dépannage contFrançais-10 Kohler CoTableau de dépannage Dépannage contINSTRUCCIONES IMPORTANTES Guía de instalaciónInterface digital EspecificacionesHerramientas y materiales Gracias por elegir los productos de KohlerBrazo de abrazadera Diagrama de instalación Antes de comenzarAbertura Espacio para el1. Preparación Labio de la 2. Prepare el sitiointerface Abertura45,7 cm 3. Instale la interfaceLazo de goteo Kohler Co1043184-2-B Instale la interface contEspañol-7 Kohler Co5. Verificación de la instalación 4. Termine la instalaciónKohler Co Español-8Verificación de la instalación cont 6. Procedimiento para resolver problemasKohler Co Procedimiento para resolver problemas contEspañol-10 1043184-2-BTabla para resolver problemas Procedimiento para resolver problemas cont1043184-2-B 2006 Kohler Co