Kohler K-683, K-684 manual Complete the Installation, Installation Checkout, Kohler Co, 1043184-2-B

Page 9
4. Complete the Installation

Power Supply

Screws

Power Supply

Optional External

Interface Cable

Molded Grommets

Drip Loop

 

Internal Interface Cable

Drip Loop

TabDoor

Clip

4. Complete the Installation

Drip Loop

IMPORTANT! Make drip loops in all cables and cords.

Press the clips to release and open the access door on the valve.

Slide the hinge side of the door in either direction until one side slips free.

Remove the door.

Connect the interface cable(s) to the valve.

Connect the power supply to the valve.

Verify all molded grommets are in place before closing the access cover.

Reinstall the access door.

To close the access door, press on the tabs until the clips snap into place.

Plug the power supply into the outlet.

5. Installation Checkout

Turn on the water supply to the valve.

Check all connections for leaks and make any adjustments as needed.

Turn on the main power supply. You should hear the valve power up and the power icon on the user interface will be lit with a green pulsing light.

If not already completed, refer to the ″Digital Interface Homeowners Guide″ to set up the interface.

Kohler Co.

9

1043184-2-B

Image 9
Contents Digital Interface Installation GuideSpecifications IMPORTANT INSTRUCTIONSThank You For Choosing Kohler Company Tools and MaterialsPlus 1/2 1.3 cm Min Clamp Arm Clearance Roughing-In Before You BeginClamp Arm Cutout1. Preparation Cutout Interface lip 1/4 6 mm 2. Prepare the Site7-11/16 19.5 cm 3-11/16 9.4 cm 52 132.1 cm3. Install the Interface Install the Interface cont 1043184-2-BKohler Co 5. Installation Checkout 4. Complete the InstallationKohler Co 1043184-2-BInstallation Checkout cont 6. TroubleshootingTroubleshooting Table Troubleshooting contTroubleshooting Table Troubleshooting contRenseignements importants Guide d’installationInterface digitale SpécificationsMerci d’avoir choisi la compagnie Kohler Outils et matérielsPlus Dégagement minimum du bras de la pince 1/2 1,3 cm Raccordement Avant de commencerDécoupe Bras de la pince1. Préparation Lèvre de 2. Préparer le sitelinterface 1/4 6 mmAnneau 3. Installer l’interface45,7 cm découlementKohler Co Installer l’interface contFrançais-7 1043184-2-B5. Vérification de l’installation 4. Compléter l’installation1043184-2-B Français-86. Dépannage Vérification de l’installation cont1043184-2-B Dépannage contFrançais-10 Kohler CoTableau de dépannage Dépannage contINSTRUCCIONES IMPORTANTES Guía de instalaciónInterface digital EspecificacionesHerramientas y materiales Gracias por elegir los productos de KohlerBrazo de abrazadera Diagrama de instalación Antes de comenzarAbertura Espacio para el1. Preparación Labio de la 2. Prepare el sitiointerface Abertura45,7 cm 3. Instale la interfaceLazo de goteo Kohler Co1043184-2-B Instale la interface contEspañol-7 Kohler Co5. Verificación de la instalación 4. Termine la instalaciónKohler Co Español-8Verificación de la instalación cont 6. Procedimiento para resolver problemasKohler Co Procedimiento para resolver problemas contEspañol-10 1043184-2-BTabla para resolver problemas Procedimiento para resolver problemas cont1043184-2-B 2006 Kohler Co