INSTALLATION CHECK LIST
Unless you are knowledgeable and experienced in stove installation, we recommend your Cheap Charlie heater receive a
COMPLETE THIS CHECK LIST PRIOR TO LIGHTING YOUR FIRST FIRE:
_____ | Carefully read this "Owner's manual”. SAVE THIS MANUAL. |
_____ | Obtain final inspection and approval by local building officials. |
_____ | Carefully clean all marks off the brass parts before the first fire is lit. Use a soft cloth and a "Windex" |
| type cleaner. Caution: Never use an abrasive cleaner on any part of your stove. |
_____ | Polish the hopper to remove the oil type coating used in manufacturing. |
_____ | Have your Authorized Cheap Charlie Dealer demonstrate all the operational, cleaning and |
| maintenance steps necessary for your stove. |
_____ | Sign and keep a copy of the |
| “Dansons Certified Installer”, found inside our appliance or available online. |
| Register online at www.dansons.com/support for Extended Warranty. |
______ | Register your purchase online at www.dansons.com/support. |
_____ | Fill the hopper with quality pellets to prime the unit; Using the CCI |
| FEED RATE Touch Pad and this will start the auger and the combustion fan. |
NOTE: Do not attempt to light a fire at this time. Leave the START / FEED RATE [ON] for 2 to 5 minutes until pellets start dropping into the burn grate. Then touch the OFF pad to turn off system . The auger is now primed to deliver fuel to the burn grate (figure 6). Then light the stove according to the directions outlined in "LIGHTING YOUR STOVE",
Hopper Lid
Heat Tubes | Hopper |
Tube Scraper |
| |
Window | Auger | |
| Auger Motor | |
Burn Grate | Fan Motors | |
Exhaust | ||
Burn Pot | ||
Air Intake | ||
Ash Pit | ||
Base | ||
| ||
CCIAU | Cutaway View |
Figure 5 |
| Figure 6 |
Copyright 2004 | 9 | Cheap Charlie Owner’s Manual |
Canadian Comfort Industries | www.dansons.com | Dansons Group Inc. |