Desa SVYD18N installation manual Attaching Stove Door

Page 12

INSTALLING

Continued

10.Attach stove door by inserting step bolt through door hinge pivot hole and into threaded hole in stove body (see Figure 8 and 11). Use an adjustable wrench or a 12mm socket to fasten step bolt. Tighten step bolt until snug. Make sure door moves freely.

Stove

Stove

Door

Door

 

Door

Hinge

Step

Bolt

Bolt

Shoulder

Threaded

Bolt

Hole

Shoulder

Door

Hinge

Step

Bolt

Stove Bottom

Figure 11 - Attaching Stove Door

12

11.Install door catch bolt (M8 x 1.25-55mm with two M8 hex nuts) into threaded hole on stove body (see Figure 8, page 10). Use an adjustable wrench or a 12mm socket. The catch bolt has two hex nuts attached to it (see Figure 12). The top nut is a bolt stop and the bottom nut is for door leveling adjustment.

Bolt Stop

Adjusting Nut

Door

Door Claw

Catch Bolt

Figure 12 - Catch Bolt and Door Claw Orientation

12.Check general catch bolt alignment with door claw. Make final adjustment and door leveling after stove is in normal standing position.

13.Carefully lift stove back up on its four attached legs.

14.Set top grate into stove top.

15.If available, install gas log heater inside stove cavity before installing the back panel (see Installing Gas Log Heater Into Stove page 13).

16.Fasten back panel to stove with six (6) M6 x 1 - 20mm bolts and washers. Make sure product identification label is located on the outside in lower left-hand corner.

104024

Image 12
Contents OWNER’S Operation and Installation Manual What to do if YOU Smell GASContents Safety Information For use with this heater Local Codes Product Features Safety PilotOperation Piezo Ignition SystemAIR for VentilationProviding Adequate Ventilation AIR for Combustion and Ventilation Determining AIR Flow for Heater LocationDetermining if You Have a Confined or Unconfined Space Ventilation AIR Installing Check GAS TypeMinimum Wall and Ceiling Clearances see Figure Stove Cavity Assembly Front ViewTop View Side ViewLaying Down Stove On Side Attaching Stove Legs Attaching Stove Door Installing Installing GAS LOG Heater Into Stove Placing Heater Base In Stove CavityConnecting to GAS Supply Installation Items NeededSide View Back View Checking GAS Connections Gas ConnectionPressure Testing Heater Gas Connections Test Pressures Equal To or Less Than 1/2 PsigFor Your Safety Read Before Lighting Operating HeaterMatch, see Manual Lighting Procedure on HeaterOperating Heater Inspecting Burners Pilot Flame PatternCleaning and Maintenance Trouble Shooting Turn off heater and let cool before cleaningODS/PILOT and Burner LogsMaintenance, TROUBLE- ShootingRefer to Air for Com Gas leak. See Warning Service ReplacementTechnical HintsIllustrated Parts Breakdown Parts List SCIVFC, Scivfb SCIVFG, Scivfr SCIVFC, Scivfb Accessory Valve GA5010104024 Warranty Information Keep this Warranty