Quadra-Fire QV-PIER, QV-ST owner manual Mark the roof hole accordingly

Page 28
•Mark the roof hole accordingly.

For Vertical Terminations - To locate the vent and install the vent sections:

Locate and mark the vent centerpoint on the underside of the roof, and drive a nail through the centerpoint.

Make the outline of the roof hole around the centerpoint nail.

The size of the roof hole framing dimensions depend on the pitch of the roof. There MUST BE a 1-inch (25.4mm) clear- ance from the vertical vent pipe to combustible materials.

Mark the roof hole accordingly.

Cover the opening of the installed vent pipes.

Cut and frame the roof hole.

Use framing lumber the same size as the roof rafters and install the frame securely. Flashing anchored to the frame must withstand heavy winds.

Continue to install concentric vent sections up through the roof hole (for inside vent installations) or up past the roof line until you reach the appropriate distance above the roof (for outside terminations).

!WARNING: MAJOR U.S. BUILDING CODES SPECIFY MINIMUM CHIMNEY AND/OR

VENT HEIGHT ABOVE THE ROOF TOP. THESE MIN- IMUM HEIGHTS ARE NECESSARY IN THE INTER- EST OF SAFETY. SEE THE FOLLOWING DIAGRAM FOR MINIMUM HEIGHTS, PROVIDED THE TERMI- NATION CAP IS AT LEAST 20 INCHES FROM A VER- TICAL WALL AND 2-FEET BELOW A HORIZONTAL OVERHANG.

NOTE: This also pertains to vertical vent systems in- stalled on the outside of the building.

To seal the roof hole, and to divert rain and snow from the vent system:

Attach a flashing to the roof using nails, and use a non- hardening mastic around the edges of the flashing base where it meets the roof.

Attach a storm collar over the flashing joint to form a water-tight seal. Place non-hardening mastic around the joint, between the storm collar and the vertical pipe.

Slide the termination cap over the end of the vent pipe and snap into place.

 

 

HORIZONTAL

 

 

OVERHANG

2 FT.

20 INCH MIN.

VERTICAL

MIN.

 

 

WALL

 

 

 

LOWEST

 

 

DISCHARGE

 

TERMINATION

OPENING

 

 

 

CAP

 

 

 

 

X

 

 

12

 

 

ROOF PITCH

 

 

IS X/ 12

 

H (MIN.) - MINIMUM HEIGHT FROM ROOF

 

TO LOWEST DISCHARGE OPENING

Roof Pitch

H (min.) ft.

flat to 6/12

1.0

over 6/12 to 7/12

1.25

over 7/12 to 8/12

1.5

over 8/12 to 9/12

2.0

over 9/12 to 10/12

2.5

over 10/12 to 11/12

3.25

over 11/12 to 12/12

4.0

over 12/12 to 14/12

5.0

over 14/12 to 16/12

6.0

over 16/12 to 18/12

7.0

over 18/12 to 20/12

7.5

over 20/12 to 21/12

8.0

Figure 30. Minimum Height from Roof to Lowest Discharge Opening

28

Quadra-FireQV-PIER, QV-ST Series: HV-IPI2005-901 Rev. G • 2/06

Image 28
Contents Models QV-Pier QV-ST Series HV-IPI What to do if you smell gasSafety and Warning Information PROHIBITEDTable of Contents QV-Pier-HV-IPI Service Parts List6 Log Assembly ACCESSORIES QV-PIER-HV-IPICOMMON PART SERIAL #Service Parts 11710QV-ST-HV-IPI NG, LP Exploded Parts DiagramQV-ST-HV-IPI QV-PIER-HV-IPI Service PartsQV-ST-HV-IPI 1Approvals and Codes Installation CodesHigh Altitude Installations Appliance CertificationPre-installPreparation 2Getting StartedIntroducing the Quadra-FireGas Fireplaces Diagram of the QV-PIER-HV-IPI GAS LINE ACCESS ELECTRICAL ACCESSTOP STANDOFFS REAR VENT3Installing the Fireplace Step 1. Locating the FireplaceStep 2. Framing the Fireplace Model QV-PIER-HV-IPI35-3/4 QV-ST-HV-IPINOTE PIPES OVERLAP 1-1/4INCHES AT EACH JOINT DVP90STStep 3. Installing the Vent System A. Vent System ApprovalsTEMS OR COMPONENTS MAY BE USED Identifying Vent ComponentsFlue Restrictor Instructions Figure 13. Venting with One 90 Elbow Figure 14. Venting with One 90 ElbowFigure 15. Venting with Two 90 Elbows Venting with Two 90 Elbows Figure 17. Venting with Two 90 ElbowsFigure 18. Venting with three 90 elbows Figure 19. Venting with three 90 elbows B. Installing Vent Components Venting Out Vertically2. Continue Adding Vent Components Figure 25 Hole & New Framing Members = AREA WHERE TERMINAL IS NOT PERMITTED Figure 29. Vent Termination Minimum Clearances= VENT TERMINAL X = AIR SUPPLY INLETMark the roof hole accordingly Step 5. The Gas Control System Pressure Natural GasPropane 5.0 inchesStep 8. Wiring the Fireplace For Intermittent Pilot Ignition WiringOperation using Battery Power Appliance RequirementsFigure 35. Fan Wiring Diagram Optional AccessoriesFan Installation Wall SwitchIN ANY MANNER Step 9. FinishingFigure 40. Sealant Material Hearth Extensions ANDIRONS 1/2”ANDIRON TABS Page Figure 53. Placement of the Ember Material Placing the Ember MaterialStep 11. Before Lighting the Fireplace After the InstallationStep 12. Lighting the Fireplace 4Maintaining and Servicing Your Fireplace Fireplace Maintenance5 Troubleshooting SymptomPossible Causes Corrective ActionsSymptom Intellifire Ignition System - continuedPossible Causes Corrective ActionsLifetime Warranty LIMITED LIFETIME WARRANTYTHREE YEAR WARRANTY TWO YEAR WARRANTY