Napoleon Fireplaces 1600C-1 specifications Table of Contents

Page 3

PLEASE RETAIN THIS MANUAL FOR FUTURE REFERENCE

TABLE of CONTENTS

INTRODUCTION

p. 4

 

MOBILE HOME INSTALLATION

p. 8

General information

p. 4

 

Venting

p. 8

Principal of operation

p. 4

 

Outside air

p. 8

Care of glass

p. 4

 

113KT 1600C Adaptor Kit Intallation

p. 8

INSTALLATION

 

p. 5

 

OPERATING INSTRUCTIONS

p. 9

Alcove installation

 

p. 6

 

When lit for the first time

p. 9

Stove installation

 

p. 6

 

Achieving proper draft

p. 9

INSTALLATION WHEN INSTALLED WITH

 

Fire extinguishers / smoke detectors

p. 10

 

Fuel loading and burn cycle

p. 10

BLOWER KIT EP63

 

p. 6

 

 

 

EP63 OPTIONAL BLOWER KIT

p. 10

 

 

 

 

 

 

 

Adding chimney sections

 

p. 7

 

Ash removal procedures

p. 10

 

 

EP90-K OPTIONAL SCREEN KIT

p. 10

Outside air

 

p. 7

 

 

 

 

 

Flue collar reversal

 

p. 7

 

 

WOOD PILE MAINTENANCE

p. 11

Ash fender installation

 

p. 7

 

 

 

 

 

Wall pass-through

 

p. 7

 

STOVE MAINTENANCE

p. 11

Heat shield installation

 

p. 7

 

 

Creosote formation and removal

p. 11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Runaway or chimney fire

p. 11

 

 

 

 

 

 

 

ORDERING PROCEDURES

p. 12

 

 

 

 

 

 

 

 

 

)

SPECIFICATIONS

MODEL 1600C-1

 

 

 

 

WIDTH X DEPTH

681 X 615 mm

26.8” X 24.2”

HEIGHT

712 mm

28.0”

REAR FLUE HEIGHT (A)

698 mm

27,5”

CHAMBER (D.W.H.)

304 X 520 X 265 mm

11.9” X 20.4” X 10.4”

CAPACITY (LITER)

41.3 L

1.46 ft3

APP. AREA HEATED *

56-112 m2

600-1200 ft2

HEAT OUTPUT (HIGH BURN) **

50,000 Btu

 

DURATION LOW FIRE

7 hr

 

WEIGHT

150 KG

330 LB

 

 

 

*FIGURES WILL VARY CONSIDERABLY WITH INDIVIDUAL CONDITIONS.

** WOLF STEEL LTD. ESTIMATED REALISTIC BTU/H WITH HARDWOOD LOGS AND REGULAR REFUELING.

3

Image 3
Contents Fax Email ask@napoleon.on.ca For Your SafetyConditions and Limitations Table of Contents Care of glass IntroductionGeneral information Principal of operationInstallation Alcove installationStove installation Installation When Installed with Blower KIT EP63 Outside air Flue collar reversal Ash fender installationHeat shield installation Chimney connection Adding chimney sectionsVenting Outside air / Floor Securing113KT 1600C-1 Adaptor Kit Intallation When lit for the first time Operating InstructionsAchieving proper draft EP63 Optional Blower KIT Ash removal proceduresFire extinguishers / smoke detectors Fuel loading and burn cycleRunaway or chimney fire Wood Pile MaintenanceStove Maintenance Creosote formation and removalCode Description Qty Ordering ProceduresAccessories Page Pour Votre Sécurité Modèle 1600C-1Conditions ET Limitations LA Garantie DU PrésidentSpécifications Modèle 1600C-1Poids Nettoyez Seulement Lorsque LA Vitre EST Froide Informations généralesPrincipe de fonctionnement Soin de la vitreConduit Installation dans une alcôveInstallation du poêle PoêleInstallation Avec LE KIT Soufflerie EP63 Ajout de sections de cheminée Installation du récupérateur de cendreInstallation de l’écran de dessous Raccordement de la cheminéeAdaptateur pour prise d’air extérieur 113KT Installation Dans UNE Maison Mobile’évacuation Air extérieur/fixation au plancherCréer un tirage approprié Lors du premier allumagePare-étincelles optionnel EP90K Extincteurs et détecteurs de fuméeSoufflerie optionnelle EP63 Méthodes de décendrageFeu de cheminée ou feu hors contrôle Entretien DU TAS DE BoisEntretien DU Poêle Formation et enlèvement de créosoteRemplacements Diam Accessoires