Napoleon Fireplaces 1600C-1 specifications Installation When Installed with Blower KIT EP63

Page 6

INSTALLATION WHEN INSTALLED WITH BLOWER KIT EP63

For reduced clearances installation must comply with NFPA 211or CAN/CSA-B365.

Alcove installation

Model 1600C-1 may be installed into an alcove having a depth of not more than 4 feet and a height of at least 7 feet, when using a listed double wall connector that is rated for a minimum 12” clearance to combustible material.

The minimum clearances are as shown.

Alcove installation

Listed single wall chimney connector

 

 

Flue configuration

 

 

 

 

 

Type 1

Horizontal

Vertical

 

 

 

 

 

 

 

 

 

A

16”

16”

FROM

 

 

 

 

 

 

B*

10”

16”

UNIT

 

 

 

 

 

 

 

C

11”

11”

 

 

 

 

 

 

 

 

 

D

25”

25”

FROM

 

 

 

 

 

 

E

...

18”

PIPE

 

 

 

 

 

 

 

F

...

18”

 

 

 

 

*A 18 in. Minimum clearance should be maintained from combustible wall to the chimney connector.

16"

16"

16"

4footmax

84"

Ilustratedwith.75"hearthpad.

Double walled connectors listed for a minimum clearance of 12” or less from combustible materials must be used to achieve the following clearances.

 

 

Flue configuration

 

 

 

 

 

Type 2

Horizontal

Vertical

 

 

 

 

 

 

 

 

 

A

16”

16”

FROM

 

 

 

 

 

 

B

10”

10”

UNIT

 

 

 

 

 

 

 

C

11”

11”

 

 

 

 

 

 

 

 

 

D

25”

25”

FROM

 

 

 

E

...

16”

Walls shall not extend from front of unit when installed

in the alcove configuration.

Stove installation

PIPE

 

 

F

...

12”

If the stove is to be installed on a combustible floor, it must be p l a c e d o n a a p p r o v e d non-combustible hearth pad, t h a t e x t e n d s 8 " ( 2 0 0 m m ) beyond the stove sides and back, and 18" (455mm) to the front.

8"

8"

18"

8"

F

B

D

 

 

A

C

E

C

6

Image 6
Contents For Your Safety Fax Email ask@napoleon.on.caConditions and Limitations Table of Contents Principal of operation IntroductionGeneral information Care of glassInstallation Alcove installationStove installation Installation When Installed with Blower KIT EP63 Chimney connection Adding chimney sections Ash fender installationHeat shield installation Outside air Flue collar reversalVenting Outside air / Floor Securing113KT 1600C-1 Adaptor Kit Intallation When lit for the first time Operating InstructionsAchieving proper draft Fuel loading and burn cycle Ash removal proceduresFire extinguishers / smoke detectors EP63 Optional Blower KITCreosote formation and removal Wood Pile MaintenanceStove Maintenance Runaway or chimney fireOrdering Procedures Code Description QtyAccessories Page Modèle 1600C-1 Pour Votre SécuritéLA Garantie DU Président Conditions ET LimitationsSpécifications Modèle 1600C-1Poids Soin de la vitre Informations généralesPrincipe de fonctionnement Nettoyez Seulement Lorsque LA Vitre EST FroidePoêle Installation dans une alcôveInstallation du poêle ConduitInstallation Avec LE KIT Soufflerie EP63 Raccordement de la cheminée Installation du récupérateur de cendreInstallation de l’écran de dessous Ajout de sections de cheminéeAir extérieur/fixation au plancher Installation Dans UNE Maison Mobile’évacuation Adaptateur pour prise d’air extérieur 113KTLors du premier allumage Créer un tirage appropriéMéthodes de décendrage Extincteurs et détecteurs de fuméeSoufflerie optionnelle EP63 Pare-étincelles optionnel EP90KFormation et enlèvement de créosote Entretien DU TAS DE BoisEntretien DU Poêle Feu de cheminée ou feu hors contrôleRemplacements Accessoires Diam