Napoleon Fireplaces 1600C-1 specifications Installation, Alcove installation, Stove installation

Page 5

INSTALLATION

For reduced clearances installation must comply with NFPA 211or CAN/CSA-B365.

For clearances when installed with blower kit EP63, refer to page 6.

Alcove installation

Model 1600C-1 may be installed into an alcove having a depth of not more than 4 feet and a height of at least 7 feet, when using a listed double wall connector that is rated for a minimum 12” clearance to combustible material.

The minimum clearances are as shown.

Alcove installation

Listed single wall chimney connector

 

 

Flue configuration

 

 

 

 

 

Type 1

Horizontal

Vertical

 

 

 

 

 

 

 

 

 

A

16”

16”

FROM

 

 

 

 

 

 

B*

22”

22”

UNIT

 

 

 

 

 

 

 

C

15”

15”

 

 

 

 

 

 

 

 

 

D

25”

25”

FROM

 

 

 

 

 

 

E

...

22”

PIPE

 

 

 

 

 

 

 

 

 

 

* A 22 in. Minimum clearance must be maintained from

16"

22"

16"

4footmax

84"

Ilustratedwith.75"hearthpad.

combustible wall to the chimney connector.

Double walled connectors listed for a minimum clearance of 12” or less from combustible materials must be used to achieve the following clearances.

 

 

Flue configuration

 

 

 

 

 

 

 

 

 

Type 2

Horizontal

Vertical

 

 

 

 

 

 

 

 

 

A

16”

16”

FROM

 

 

 

 

 

 

B

14”

14”

UNIT

 

 

 

 

 

 

C

15”

15”

 

Walls shall not extend from front of unit when installed

in the alcove configuration.

Stove installation

 

D

25”

25”

FROM

 

 

 

 

 

 

E

...

16”

PIPE

 

 

 

 

 

 

 

 

 

If the stove is to be installed on a combustible floor, it must be p l a c e d o n a a p p r o v e d non-combustible hearth pad, t h a t e x t e n d s 8 " ( 2 0 0 m m ) beyond the stove sides and back, and 18" (455mm) to the front.

8"

8"

18"

8"

B

D

 

 

A

C

E

 

 

C

5

Image 5
Contents Fax Email ask@napoleon.on.ca For Your SafetyConditions and Limitations Table of Contents General information IntroductionPrincipal of operation Care of glassStove installation InstallationAlcove installation Installation When Installed with Blower KIT EP63 Heat shield installation Ash fender installationChimney connection Adding chimney sections Outside air Flue collar reversal113KT 1600C-1 Adaptor Kit Intallation VentingOutside air / Floor Securing Achieving proper draft When lit for the first timeOperating Instructions Fire extinguishers / smoke detectors Ash removal proceduresFuel loading and burn cycle EP63 Optional Blower KITStove Maintenance Wood Pile MaintenanceCreosote formation and removal Runaway or chimney fireCode Description Qty Ordering ProceduresAccessories Page Pour Votre Sécurité Modèle 1600C-1Conditions ET Limitations LA Garantie DU PrésidentPoids SpécificationsModèle 1600C-1 Principe de fonctionnement Informations généralesSoin de la vitre Nettoyez Seulement Lorsque LA Vitre EST FroideInstallation du poêle Installation dans une alcôvePoêle ConduitInstallation Avec LE KIT Soufflerie EP63 Installation de l’écran de dessous Installation du récupérateur de cendreRaccordement de la cheminée Ajout de sections de cheminée’évacuation Installation Dans UNE Maison MobileAir extérieur/fixation au plancher Adaptateur pour prise d’air extérieur 113KTCréer un tirage approprié Lors du premier allumageSoufflerie optionnelle EP63 Extincteurs et détecteurs de fuméeMéthodes de décendrage Pare-étincelles optionnel EP90KEntretien DU Poêle Entretien DU TAS DE BoisFormation et enlèvement de créosote Feu de cheminée ou feu hors contrôleRemplacements Diam Accessoires