TOP VERTICAL TERMINATION

when (HT) > (VT)

Simple venting configurations

FIGURE 10

For vent configurations requiring more than two 90° elbow (top exit) or one 90° elbow (rear exit), the following formulas apply:

Formula 1: HT < 3VT

Formula 2: HT + VT < 40 feet

Example 7:

 

90°

 

 

 

 

 

 

 

 

 

 

 

 

 

 

90°

 

 

 

 

 

V3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V1

 

 

 

 

 

 

2

 

 

H

 

 

 

 

H

 

 

V

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

90°

 

 

 

 

 

 

90°

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

See graph to determine the required vertical rise VT for the required horizontal run HT.

MAXIMUM

VERTICAL

RISE IN

FEET

VT

HORIZONTAL VENT RUN PLUS OFFSET IN FEET HT

The shaded area within the lines represents acceptable values for HT and VT .

FIGURE 11

V1

=2 ft

V2

=1 ft

V3

=1.5 ft

VT

= V1

+ V2 + V3 = 2 + 1 + 1.5 = 4.5 ft

H1

=6 ft

H2

=2 ft

HR

= H1

+ H2 = 6 + 2 = 8 ft

HO

= .03(four 90° elbows - 90°)

 

= .03(90 + 90 + 90 + 90 - 90) = 8.1 ft

HT

=HR + HO = 8 + 8.1 = 16.1 ft

HT + VT

= 16.1 + 4.5 = 20.6 ft

Formula 1:

HT < 3VT

 

 

3VT = 3 x 4.5 = 13.5 ft

 

 

16.1 > 13.5

Since this formula is not met, this vent configuration is unacceptable.

Formula 2: HT + VT < 40 feet 20.6 < 40

Since only formula 2 is met, this vent configuration is unacceptable and a new fireplace location or vent con- figuration will need to be established to satisfy both for-

W415-0447 / B / 05.24.05

Image 10
Contents W415-0447 / B What to do if YOU Smell GAS Table of Contents Napoleon GAS Fireplace Presidents Lifetime Limited Warranty General Instructions General InformationCare of GLASS, and Plated Parts VentingVenting Lengths & AIR Terminal Locations Definitions TOP Exit / Horizontal TerminationElbow Vent Length Values V190 TOP Exit Vertical Termination TOP Vertical Termination Formula 1 HT 3VT Formula 2 HT + VT 40 feet ExampleAIR Terminal Installations Horizontal Installation Installation Wall and Ceiling ProtectionVertical Installation Horizontal AIR Terminal Installation Using Flexible Vent ComponentsVertical AIR Terminal Installation Extended Horizontal AIR Terminal Installation Using Rigid Vent ComponentsFireplace Vent Connection Vertical Venting Installation GAS Installation Restricting Vertical VentsFraming Clearance to CombustiblesElectrical Connection Hard Wiring ConnectionSchematic Mantle ClearancesFinishing LOG Shipping BracketGlowing Embers LOG PlacementBaffle Installation Charcoal EmbersBlower Replacement Lamp ReplacementControl Door Remote and Valve AccessInner Access Door Remote Receiver RemovalFireplace Operation Operation / MaintenanceHand Held Remote Operation Operating Instructions Pilot Burner Adjustment AdjustmentsMaintenance Venturi AdjustmentReplacements W415-0447 / B Trouble Shooting Guide Symptom Problem Test SolutionStanding Main