Lennox International Inc G32Q4-125 Electrostatic Discharge ESD, GAS Pipe Capacity ft.3/hr Im31hrl

Page 16

TABLE 5

GAS PIPE CAPACITY - ft.3/hr Im31hrl

Nominal

 

Internal

 

 

 

 

Length of Pipe-Feet

(m)

 

 

 

Iron Pipe

Size

Diameter

10

20

30

40

50

60

70

80

90

100

-InchesImm)

.InchesImm)

(3.048)

(6.096)

(9.144)

(12.192)

115.2401

(18.288)

(21.336)

(24.384)

(27.432

(30.480)

 

 

t/4

 

 

364

43

29

24

29

18

18

15

14

19

12

(635)

 

 

 

(9 246)

(1 13)

(.82)

(68)

(.57)

(81)

(45)

( 401

(40}

(3?)

(.34)

 

 

3/8

 

 

493

95

65

52

45

40

36

33

31

29

27

(6,53)

 

 

 

(12.5221

(269)

(1.84)

(1 47)

(127)

(113)

(1.02)

(73)

(88)

(.82)

(75)

 

 

(127)

 

622

175

120

97

82

73

66

61

57

53

50

 

(17.799)

(496)

(340)

(2.75)

(232)

(2.07)

(1.87)

(173)

(101)

(1.50)

(142)

 

 

314

 

.824

360

250

200

176

161

138

125

118

110

103

(19.05)

 

(20.930)

(10.19)

{706)

(566)

(4.81)

(4.28)

(3.91)

(3 54)

(3.34)

(3 11)

(292)

1

 

1049

680

468

379

320

288

260

240

220

208

!95

 

 

(254)

 

(26.645)

(19,25)

(13.17)

(10,62)

(9,06)

(807)

(7.36)

(6 90)

(6.23)

(580)

(6.62)

1-1/4

 

1.380

1400

960

770

660

580

630

490

460

430

400

(31.75)

 

(35.052)

(39.64)

(26.90)

(21.80)

(18,69)

(1642)

(15.01)

(13.67)

(13.031

(1218)

(11.33)

Io1/2

 

1.610

21 O0

466

1180

990

900

810

750

690

650

620

(381)

 

(40.894)

(59.46)

(41.34)

(3341)

(2803)

(2548)

(22.94)

(2124)

(19.54)

(1841)

(17,56)

2

 

2.0_7

3950

2750

2200

1906

1680

1520

1400

1300

1220

1150

(5O.8)

 

(52.502)

(111.85)

(77,87)

(62.30)

(5380)

(47.57)

(43.041

(3964)

(36.81)

(34.58)

(32.56)

2-112

 

2469

6300

4350

9520

3000

2650

2400

2250

2050

1950

1880

(83.5)

 

(67

713)

(17839)

(12317)

(9967)

(84.95)

(75.04)

(67.96)

(63.71)

(58,05)

(55.22)

(52.38)

3

 

3068

11000

7700

6250

5300

4750

4300

3900

3700

3450

3250

(76.2)

 

 

(77.927)

(31148)

(218.03)

(17698)

(150.07)

(134.50)

(121,76)

(110.43)

(104.77)

(97,69)

(92.03)

 

 

4

 

4 026

23000

15800

12800

10900

9700

8800

St00

7500

7200

6700

(101.6)

 

 

(102.260)

(651.27)

(447.39)

(362 44)

(308.64)

(274.67)

(249.t8)

(229.99)

(212.37)

(203.88)

(189.72)

 

 

NOTE - Capacity j 'iven in cubsc feet (m 3) o f gas per hour and based on O.60 specific gravity gas.

Leak Check

After gas piping is completed, carefully check all piping

connections (factory- and field-installed) for gas leaks.

Use a leak detecting solution or other preferred means.

CAUTION

Figu re 28 shows thermostat designations for identifica- tion purposes. Refer to figure 29 for control box arra nge- ment, figure 30 for a detail of the Surelight _integrated

control, figure 32 for point-to-point field wiring and figure

33 for schematic wiring diagram and troubleshooting,

ELECTROSTATIC DISCHARGE (ESD)

Precautions and Procedures

A, IMPORTANT 1

1 - Install field make-up box on either side, inside orout of the cabinet. Knockouts are provided in box and cabinet to run wiring. See figures 26 and 27.

2 - Remove cap from knockout in blower deck on the same side as the installed make-up box.

iii::i:: i.................j

A field make-upbox is provided for line voltage wiring. Line voltage wiring to unit is done through the J69 jack

from the field make-up box to plug P69 from the control

box. See figures 26 and 27 for make-up box installation.

AIMPORTANT

Page 16

Image 16
Contents Lennox TOP View AIR OutletAssembly Access Panel AIRAccess Door Interlock SwitchInches mrn Insta!iatton Setttng Equipment Shipping DamageBottom Return Filter Installation Side Return Filter Installation in.turnBottom Return Air Applications Knockout Pattern for Bottom Return AIR ApplicationPiping and Fittings Specifications Filter Door AssemblySupply Air Plenum Termination Kits G32-100 or -125 with 3 IN. VentingOUT BTUIventingractl es Resized to approach the minimum size as deter PipeWallringkit TopviewOutsidewall Wall TerminationExhaust Termination Intake Wall RingterminationFront View Exhaust Front View ,, l/EXHAUST VentSide View ExhaarusUse the provided condensate drain adapter 3/4 Nipplebootorcap AdapterFor Right-Hand Side Condensate Exit Condensate Plumbing Groundjoint typeLeft Side Piping Right Side PipingConnections factory- and field-installed for gas leaks Precautions and ProceduresElectrostatic Discharge ESD GAS Pipe Capacity ft.3/hr Im31hrlInterior MAKE-UP BOX Installation Exterior MAKE-UP BOX InstallationHole in the cabinet. a snaphole plug is providedto G32Q and Condensing UnitG32Q Control BOX Surelight Integrated Control BoardTypical G32Q Field Wiring Diagram G32Q TWO-STAGE Control BoardTypical G32Q Schematic Wiring Diagram For Your Safety Read Before Operating Honeywell VR8205 Series GAS ValveTurn gas valve knob to on position GAS Valve Shown in OFF PositionOperation sequence followssteps 1 through4 as out Manifold Pressure Measurement & Adjustment KBtuhDIFFERENTIALPRESSURESWITCHCIRCUITRYAnnual Service Temperature RiseBlower Speeds Bushing.Reconnect wires Cleaning DuralokPlus TM Heat Exchanger275F 135C Cleaning the Bumer Assembly Reinstallthe screws to secure the burner box coverCabinet Blower PartsHeating Parts SimultaneousNormal Heating Mode Abnormal Heating ModeHeating Sequence OperationNormal Heating Mode Abnormal Indoor Blower on Delay BeginsFlame Signal GAS Valve OFF. Combustion AIRHigh Heat GAS Valve OPEN? 8 SEC. Delay Pressure Switch Watchguard Combustion AIR InducerIprepurge Combustion AIR Inducer on for 2.5 MinutesNormal Cooling Mode Abnormal Cooling Mode GPRRoOuPNEDRELYIInstaller Job NumberHeating Section TH Ermostat