Lennox International Inc G32Q3-100, G32Q5-125 Temperature Rise, Blower Speeds, Annual Service

Page 24

FAN*OFFDELAYADJUSTMENT

60sec,90sec.120sec, 180sec.

To adjust fan-off delay, flip dip switch to desired setting.

FIGURE 36

Temperature Rise

Check temperature rise and, if necessary, adjust blower speed to maintain temperature rise within range shown on unit rating plate.

Two-Stage Control

The two-stage controlallows the field selection of one of three modes of operation:

a - "TWO STAGE" operationcontrolledby a two-stageroom thermostat;

b- "ONE STAGE" operation controlled by a single- stage room thermostat(high heat only); and

c - "W2 TIMED" operationwith secondstage timed ON controlledby a single-stageroomthermostat.Three second-stage timed ON settings are available for field selection. They are 8, 12 and 15 minutes.(The factory setting is 8 minutes.) Refer to figure 31 for controlboard layout and jumper locations.

Electrical

1 - Check all wiringfor loose connections.

2 - Check circuit breaker located on unit controlbox.

3 - Check for the correct voltage at the furnace (furnace operating).

4 - Check amp-draw on the blower motor.

Motor NameplateActual

NOTE - Do not secure electrical conduit directly to duct- ing or structure.

Blower Speeds

Refer to blower speed selection chart on unit wiring dia- gram.

NOTE - CFM readings are takenextema/ to unitwitha dry

evaporator coil fi/ter insta//ed and without any other ac- cessories,

Electronic Ignition

The SureLight TM integratedcontrol has an added feature of an internal watchguard control The feature serves as an automatic reset device for ignitioncontrotslockedout because the burner has failed to light.After one hour of

continuousthermostat demand for heat, the watchguard will break and remake thermostatdemand to the furnace

and automaticallyreset the controlto relightthe furnace.

Bumer Flame

Start burnerand allow to operate for a few minutesto es- tablish normal burningconditions.Check burner flame by observation. Flame should be predominantly blue and strong in appearance.

Check burnerflame periodically toensure properoperation.

CAUTION

Annual Service

At the beginning of each heating season, system should be checked as follows by a qualified service technician:

Electrical

1 - Check all wiringfor loose connections.

2 - Check circuitbreaker located on unitcontrolbox,

3- Check for the correctvoltageat the furnace(furnace operating).

4- Check amp-draw on the blower motor.

Motor Nameplate

Actual

5 - Check to see that heat (if applicable) is operating.

Blower

Check the blower wheels for debris and clean if neces- sary. The blower motors are prelubricated for extended

bearing life. No further lubdcetion is needed.

Filters

1- Filters mustbe cleanedor replaced when dirtyto as- sure proper furnace operation.

2- Reusable foam filters used with the unit can be washed with water and mild detergent. When dry, they shouldbe sprayedwith filterhandicoaterpdorto reinstallationFilter. handicoateris RP Productscoat-

ing no. 418 and is available as Lennox part no. P-8-5069.

3 - If replacement is necessary, order Lennox part no. 31J81 for 14 inchesx 25 inches(356 x 635 ram) filter for G32-75 units and P-8-7831 for 20 inches x 25

inches (508 x 635 ram) filterfor G32-100 and -125units.

Intake and Exhaust Lines

Check intake and exhaust lines and all connections for tightnessand make surethere is no blockage,hJsocheck condensate linefor free flow dudng operation.

Insulation

Outdoor pipinginsulationshoutdbe inspected yeady for deterioration. If necessary,replace with same materials.

Winterizing and Condensate Trap Care 1 - Turn off power to unit.

Page 24

Image 24
Contents Lennox TOP View AIR OutletAssembly Access Panel AIRAccess Door Interlock SwitchInches mrn Insta!iatton Setttng Equipment Shipping DamageBottom Return Filter Installation Side Return Filter Installation in.turnBottom Return Air Applications Knockout Pattern for Bottom Return AIR ApplicationFilter Door Assembly Piping and Fittings SpecificationsSupply Air Plenum Termination Kits G32-100 or -125 with 3 IN. VentingOUT BTUIventingractl es Resized to approach the minimum size as deter PipeWallringkit TopviewOutsidewall Wall TerminationExhaust Termination Intake Wall RingterminationFront View Exhaust Front View ,, l/EXHAUST VentSide View ExhaarusNipplebootorcap Adapter Use the provided condensate drain adapter 3/4For Right-Hand Side Condensate Exit Condensate Plumbing Groundjoint typeLeft Side Piping Right Side PipingConnections factory- and field-installed for gas leaks Precautions and ProceduresElectrostatic Discharge ESD GAS Pipe Capacity ft.3/hr Im31hrlInterior MAKE-UP BOX Installation Exterior MAKE-UP BOX InstallationHole in the cabinet. a snaphole plug is providedto G32Q and Condensing UnitG32Q Control BOX Surelight Integrated Control BoardTypical G32Q Field Wiring Diagram G32Q TWO-STAGE Control BoardTypical G32Q Schematic Wiring Diagram For Your Safety Read Before Operating Honeywell VR8205 Series GAS ValveTurn gas valve knob to on position GAS Valve Shown in OFF PositionOperation sequence followssteps 1 through4 as out Manifold Pressure Measurement & Adjustment KBtuhDIFFERENTIALPRESSURESWITCHCIRCUITRYTemperature Rise Annual ServiceBlower Speeds Cleaning DuralokPlus TM Heat Exchanger Bushing.Reconnect wires275F 135C Cleaning the Bumer Assembly Reinstallthe screws to secure the burner box coverCabinet Blower PartsHeating Parts SimultaneousNormal Heating Mode Abnormal Heating ModeHeating Sequence OperationNormal Heating Mode Abnormal Indoor Blower on Delay BeginsFlame Signal GAS Valve OFF. Combustion AIRHigh Heat GAS Valve OPEN? 8 SEC. Delay Pressure Switch Watchguard Combustion AIR InducerIprepurge Combustion AIR Inducer on for 2.5 MinutesNormal Cooling Mode Abnormal Cooling Mode GPRRoOuPNEDRELYIInstaller Job NumberHeating Section TH Ermostat