Lennox International Inc G32Q5-100, G32Q3-100, G32Q5-125 Typical G32Q Schematic Wiring Diagram

Page 20

TYPICAL G32Q SCHEMATIC WIRING DIAGRAM

F20M /_C

 

 

srj ,,oTi_

 

4.5 E]_(4

 

SlO

IVI

IF IJ_D]

O

 

 

 

 

Ul_

LIMIT

SI]_

 

 

 

 

c_urr l_

 

 

 

 

AiR Lml_

 

 

 

 

W_

 

Ll'_b_m

r---n 2

III I I I it i I i i

IIilll

I --_'

(ill

FIGURE 33

Page 20

Image 20
Contents Lennox TOP View AIR OutletAssembly Access Panel AIRAccess Door Interlock SwitchInches mrn Insta!iatton Setttng Equipment Shipping DamageBottom Return Filter Installation Side Return Filter Installation in.turnBottom Return Air Applications Knockout Pattern for Bottom Return AIR ApplicationSupply Air Plenum Filter Door AssemblyPiping and Fittings Specifications Termination Kits G32-100 or -125 with 3 IN. VentingOUT BTUIventingractl es Resized to approach the minimum size as deter PipeWallringkit TopviewOutsidewall Wall TerminationExhaust Termination Intake Wall RingterminationFront View Exhaust Front View ,, l/EXHAUST VentSide View ExhaarusFor Right-Hand Side Condensate Exit Nipplebootorcap AdapterUse the provided condensate drain adapter 3/4 Condensate Plumbing Groundjoint typeLeft Side Piping Right Side PipingConnections factory- and field-installed for gas leaks Precautions and ProceduresElectrostatic Discharge ESD GAS Pipe Capacity ft.3/hr Im31hrlInterior MAKE-UP BOX Installation Exterior MAKE-UP BOX InstallationHole in the cabinet. a snaphole plug is providedto G32Q and Condensing UnitG32Q Control BOX Surelight Integrated Control BoardTypical G32Q Field Wiring Diagram G32Q TWO-STAGE Control BoardTypical G32Q Schematic Wiring Diagram For Your Safety Read Before Operating Honeywell VR8205 Series GAS ValveTurn gas valve knob to on position GAS Valve Shown in OFF PositionOperation sequence followssteps 1 through4 as out Manifold Pressure Measurement & Adjustment KBtuhDIFFERENTIALPRESSURESWITCHCIRCUITRYBlower Speeds Temperature RiseAnnual Service 275F 135C Cleaning DuralokPlus TM Heat ExchangerBushing.Reconnect wires Cleaning the Bumer Assembly Reinstallthe screws to secure the burner box coverCabinet Blower PartsHeating Parts SimultaneousNormal Heating Mode Abnormal Heating ModeHeating Sequence OperationNormal Heating Mode Abnormal Indoor Blower on Delay BeginsFlame Signal GAS Valve OFF. Combustion AIRHigh Heat GAS Valve OPEN? 8 SEC. Delay Pressure Switch Watchguard Combustion AIR InducerIprepurge Combustion AIR Inducer on for 2.5 MinutesNormal Cooling Mode Abnormal Cooling Mode GPRRoOuPNEDRELYIInstaller Job NumberHeating Section TH Ermostat