New Buck Corporation 1127B Installation, Wall Mounted, Freestanding heater with optional pedestal

Page 11
INSTALLATION

INSTALLATION

NOTE: This heater may be installed three different ways:

1.Wall Mounted

2.Freestanding heater (with optional pedestal)

3.Freestanding (with optional wooden mantel)

WALL MOUNT INSTALLATION:

1.After determining the location for the heater, unfold the template provided and place the bottom of the template a minimum of 7" from bottom of unit to floor.

NOTE: Be sure to level the template before punching the holes.

2.With the template in place and the four black dots centered on studs, punch the four centers marked in the black dots with a sharp pointed object. Insert the four wood screws provided with the unit into the four punched holes.

NOTE: Leave 5/8" of the screwprojecting from the finished wall.

FINISHED WALL

Figure 3

5/8" or 15.875 mm

For sheet rock walls, use wing nuts or anchor wings. Remove the wing nut from the bolt. Place a nut and washer with the same thread and size on the bolt. Push the wing nut through the wall surface allowing the wings to spread. Tighten the nut that you placed on the bolt, leaving the required 5/8" between the back of the bolt head and the finished wall.

Washer

Figure 4

Nut

Toggle Bolt

Sheet Rock Stud Wall

Wing Nut

5/8" or 15.875 mm 1.Wall Mounted

9

Image 11
Contents 8000 Highway 226 South Spruce Pine, NC NEW BUCK CORPORATIONMODEL 1127B VENT-FREEGAS HEATER Manufacturer NEW BUCK CORPORATION P.O. BoxPage TABLE OF CONTENTS Page SAFETY INFORMATION WARNINGS Do not try to light any appliance 21. . ”WARNING Failure to keep the primary air openings of the burners clean may result in sooting and property damage.” PRODUCT IDENTIFICATION PIEZO IGNITION SYSTEM PRODUCT FEATURESUNPACKING SAFETY DEVICEFor convenience and efficiency, install heater MINIMUM CLEARANCES TO COMBUSTIBLE CONSTRUCTIONNOTE FOR GARAGE INSTALLATION 3.Freestanding with optional wooden mantel INSTALLATION1.Wall Mounted 2.Freestanding heater with optional pedestalCLEANING INFORMATION FREESTANDING OPTIONAL WOODEN MANTEL INSTALLATION FREESTANDING WITH OPTIONAL PEDESTAL INSTALLATIONOPTIONAL “L” BRACKETS 2 AND SCREWS 2 PRO DETERMINING FRESH-AIRFLOW FOR HEATER LOCATION PRODUCING ADEQUATE VENTILATIONVent-freeheater VENTILATION AIR FROM INSIDE BUILDING VENTILATION AIRVENTILATION AIR FROM OUTDOORS FLAME GAS CONNECTIONExternal Regulator Vent Pointing Down CONNECTING TO A GAS SUPPLYPropane Supply Tank Installation must include manual shutoff valve and plugged 1/2 NPT tap. Locate NPT tap within reach for test gauge hook-up.NPT tap must be upstream from unit GAS PRESSURE CHECK Front View of Logs LOG PLACEMENT FORLogs are shipped secured in unit OPERATING INSTRUCTIONS FOR YOUR SAFETY, READ BEFORE LIGHTINGLIGHTING INSTRUCTIONS MODULATING VALVEMAXITROL for “HIGH” LIGHTING INSTRUCTIONSto IGNITE and for “LOW”O.D.S PILOT BURNER TO TURN OFF GAS TO APPLIANCEIGNITER ELECTRODE THERMO-COUPLE THERMOSTAT CONTROL OPERATION MANUAL LIGHTING PROCEDUREFLAME CHECK INCORRECT FLAME PATTERN AT HIGH POSITION BURNER FLAME PATTERNCORRECT FLAME PATTERN AT HIGH POSITION Figure 1815 - Correct Burner Flame PatternJUMPERTHERMOSTAT WIRING DIAGRAMPOWER CORD MOTORSERVICING REPAIR PARTSCLEANING IMPORTANT SAFEGUARDSTROUBLE-SHOOTING POSSIBLE PROBLEMSOLUTION OBSERVED1.Control knob is not fully pressed in Delayed ignition of burner 1. Heater produces a clinking MODEL 1127 - MODULATING VALVE TECHNICAL SERVICEPARTS LIST MOTOR, AND ALL REMOVABLE PARTS BLOWN UP VIEW OF HEATER, FANBURNER SYSTEM PARTS LISTBLOWN UP VIEW OF BURNER ASSEMBLY NEW BUCK CORPORATION LIMITED WARRANTY ON VENT-FREEGAS LOG HEATER