New Buck Corporation 1127B manual Ventilation Air From Inside Building

Page 17
VENTILATION AIR

VENTILATION AIR

VENTILATION AIR FROM INSIDE BUILDING

This fresh air would come from an adjoining unconfined space. When venting to an adjoining space, you must provide two permanent openings: one within 12" of the ceiling and one within 12" of the floor on the wall connecting the two spaces (see Options 1 and 2, Figure 8). You can also remove door into adjoining room (see Option 3, in Figure 8).

NOTE: Each opening shall have a minimum free area of 1 square inch per 1000 BTU’s per hour of the total input rating of all gas utilization equipment in the confined space, but not less than 100 square inches.

Figure 8

15

Image 17
Contents MODEL 1127B VENT-FREEGAS HEATER NEW BUCK CORPORATIONManufacturer NEW BUCK CORPORATION P.O. Box 8000 Highway 226 South Spruce Pine, NCPage TABLE OF CONTENTS Page SAFETY INFORMATION WARNINGS Do not try to light any appliance 21. . ”WARNING Failure to keep the primary air openings of the burners clean may result in sooting and property damage.” PRODUCT IDENTIFICATION UNPACKING PRODUCT FEATURESSAFETY DEVICE PIEZO IGNITION SYSTEMFor convenience and efficiency, install heater MINIMUM CLEARANCES TO COMBUSTIBLE CONSTRUCTIONNOTE FOR GARAGE INSTALLATION 1.Wall Mounted INSTALLATION2.Freestanding heater with optional pedestal 3.Freestanding with optional wooden mantelCLEANING INFORMATION FREESTANDING OPTIONAL WOODEN MANTEL INSTALLATION FREESTANDING WITH OPTIONAL PEDESTAL INSTALLATIONOPTIONAL “L” BRACKETS 2 AND SCREWS 2 PRO DETERMINING FRESH-AIRFLOW FOR HEATER LOCATION PRODUCING ADEQUATE VENTILATIONVent-freeheater VENTILATION AIR FROM INSIDE BUILDING VENTILATION AIRVENTILATION AIR FROM OUTDOORS FLAME GAS CONNECTIONExternal Regulator Vent Pointing Down CONNECTING TO A GAS SUPPLYPropane Supply Tank Installation must include manual shutoff valve and plugged 1/2 NPT tap. Locate NPT tap within reach for test gauge hook-up.NPT tap must be upstream from unit GAS PRESSURE CHECK Front View of Logs LOG PLACEMENT FORLogs are shipped secured in unit OPERATING INSTRUCTIONS FOR YOUR SAFETY, READ BEFORE LIGHTINGLIGHTING INSTRUCTIONS MODULATING VALVEMAXITROL to IGNITE and LIGHTING INSTRUCTIONSfor “LOW” for “HIGH”O.D.S PILOT BURNER TO TURN OFF GAS TO APPLIANCEIGNITER ELECTRODE THERMO-COUPLE THERMOSTAT CONTROL OPERATION MANUAL LIGHTING PROCEDUREFLAME CHECK CORRECT FLAME PATTERN AT HIGH POSITION BURNER FLAME PATTERNFigure 1815 - Correct Burner Flame Pattern INCORRECT FLAME PATTERN AT HIGH POSITIONPOWER CORD WIRING DIAGRAMMOTOR JUMPERTHERMOSTATSERVICING REPAIR PARTSCLEANING IMPORTANT SAFEGUARDSTROUBLE-SHOOTING SOLUTION PROBLEMOBSERVED POSSIBLE1.Control knob is not fully pressed in Delayed ignition of burner 1. Heater produces a clinking MODEL 1127 - MODULATING VALVE TECHNICAL SERVICEPARTS LIST MOTOR, AND ALL REMOVABLE PARTS BLOWN UP VIEW OF HEATER, FANBURNER SYSTEM PARTS LISTBLOWN UP VIEW OF BURNER ASSEMBLY NEW BUCK CORPORATION LIMITED WARRANTY ON VENT-FREEGAS LOG HEATER