New Buck Corporation 1127B manual Servicing, Repair Parts

Page 31
SERVICING

NOTE: #PE A24001 Blower Motor

Rating: 120 volts/60MZ/0.54 Amps. 1 P.H.

Blower Motor is standard on all Model 1127B. See page 38 for blower motor location.

NOTE: For convenience, allow licensed electrician to properly install a grounded 3-plug receptacle near the unit.

SERVICING

Repair and replacement work should only be performed by a qualified service technician.

Always shut off the gas supply and make sure heater is cool before beginning any service operation. Check for gas leaks after servicing.

REPAIR PARTS

A parts list with exploded view follows. Always include correct name, part number, and model number of the heater when ordering service parts. Please contact your local dealer or distributor when ordering. If one is not available, you may contact:

New Buck Corporation

8000 Highway 226 South

Spruce Pine, NC 28777

828-765-6144

29

Image 31
Contents 8000 Highway 226 South Spruce Pine, NC NEW BUCK CORPORATIONMODEL 1127B VENT-FREEGAS HEATER Manufacturer NEW BUCK CORPORATION P.O. BoxPage TABLE OF CONTENTS Page SAFETY INFORMATION WARNINGS Do not try to light any appliance 21. . ”WARNING Failure to keep the primary air openings of the burners clean may result in sooting and property damage.” PRODUCT IDENTIFICATION PIEZO IGNITION SYSTEM PRODUCT FEATURESUNPACKING SAFETY DEVICENOTE FOR GARAGE INSTALLATION MINIMUM CLEARANCES TO COMBUSTIBLE CONSTRUCTIONFor convenience and efficiency, install heater 3.Freestanding with optional wooden mantel INSTALLATION1.Wall Mounted 2.Freestanding heater with optional pedestalCLEANING INFORMATION FREESTANDING OPTIONAL WOODEN MANTEL INSTALLATION FREESTANDING WITH OPTIONAL PEDESTAL INSTALLATIONOPTIONAL “L” BRACKETS 2 AND SCREWS 2 PRO DETERMINING FRESH-AIRFLOW FOR HEATER LOCATION PRODUCING ADEQUATE VENTILATIONVent-freeheater VENTILATION AIR FROM INSIDE BUILDING VENTILATION AIRVENTILATION AIR FROM OUTDOORS FLAME GAS CONNECTIONPropane Supply Tank CONNECTING TO A GAS SUPPLYExternal Regulator Vent Pointing Down Installation must include manual shutoff valve and plugged 1/2 NPT tap. Locate NPT tap within reach for test gauge hook-up.NPT tap must be upstream from unit GAS PRESSURE CHECK Logs are shipped secured in unit LOG PLACEMENT FORFront View of Logs LIGHTING INSTRUCTIONS MODULATING VALVEMAXITROL FOR YOUR SAFETY, READ BEFORE LIGHTINGOPERATING INSTRUCTIONS for “HIGH” LIGHTING INSTRUCTIONSto IGNITE and for “LOW”IGNITER ELECTRODE THERMO-COUPLE TO TURN OFF GAS TO APPLIANCEO.D.S PILOT BURNER THERMOSTAT CONTROL OPERATION MANUAL LIGHTING PROCEDUREFLAME CHECK INCORRECT FLAME PATTERN AT HIGH POSITION BURNER FLAME PATTERNCORRECT FLAME PATTERN AT HIGH POSITION Figure 1815 - Correct Burner Flame PatternJUMPERTHERMOSTAT WIRING DIAGRAMPOWER CORD MOTORSERVICING REPAIR PARTSCLEANING IMPORTANT SAFEGUARDSTROUBLE-SHOOTING POSSIBLE PROBLEMSOLUTION OBSERVED1.Control knob is not fully pressed in Delayed ignition of burner 1. Heater produces a clinking MODEL 1127 - MODULATING VALVE TECHNICAL SERVICEPARTS LIST MOTOR, AND ALL REMOVABLE PARTS BLOWN UP VIEW OF HEATER, FANBURNER SYSTEM PARTS LISTBLOWN UP VIEW OF BURNER ASSEMBLY NEW BUCK CORPORATION LIMITED WARRANTY ON VENT-FREEGAS LOG HEATER