New Buck Corporation 1127B manual Gas Connection, Flame

Page 19
GAS CONNECTION

GAS CONNECTION

Check gas type. Use only the type of gas indicated on the valve rating plate. If the type of gas listed on the plate is not your type of gas supply, DO NOT INSTALL. Contact your dealer for proper model. Always use an external regulator for all LP heaters to reduce the supply tank pressure to a maximum of 13" W.C. This is in addition to the regulator furnished with the heater.

The normal gas connection is 3/8” N.P.T. made at the left side (facing the front of the appliance) of the appliance. If a right side connection is desired, the connecting pipe may be led under the rear of the burner base to terminate at the right side for connection to the inlet of the valve.

NOTE: The connecting pipe must be internally tinned copper tubing for use with natural gas. Test for leaks using a solution of soap and water after completing the connection. DO NOT USE OPEN

FLAME.

17

Image 19
Contents 8000 Highway 226 South Spruce Pine, NC NEW BUCK CORPORATIONMODEL 1127B VENT-FREEGAS HEATER Manufacturer NEW BUCK CORPORATION P.O. BoxPage TABLE OF CONTENTS Page SAFETY INFORMATION WARNINGS Do not try to light any appliance 21. . ”WARNING Failure to keep the primary air openings of the burners clean may result in sooting and property damage.” PRODUCT IDENTIFICATION PIEZO IGNITION SYSTEM PRODUCT FEATURESUNPACKING SAFETY DEVICENOTE FOR GARAGE INSTALLATION MINIMUM CLEARANCES TO COMBUSTIBLE CONSTRUCTIONFor convenience and efficiency, install heater 3.Freestanding with optional wooden mantel INSTALLATION1.Wall Mounted 2.Freestanding heater with optional pedestalCLEANING INFORMATION FREESTANDING OPTIONAL WOODEN MANTEL INSTALLATION FREESTANDING WITH OPTIONAL PEDESTAL INSTALLATIONOPTIONAL “L” BRACKETS 2 AND SCREWS 2 PRO DETERMINING FRESH-AIRFLOW FOR HEATER LOCATION PRODUCING ADEQUATE VENTILATIONVent-freeheater VENTILATION AIR FROM INSIDE BUILDING VENTILATION AIRVENTILATION AIR FROM OUTDOORS FLAME GAS CONNECTIONPropane Supply Tank CONNECTING TO A GAS SUPPLYExternal Regulator Vent Pointing Down Installation must include manual shutoff valve and plugged 1/2 NPT tap. Locate NPT tap within reach for test gauge hook-up.NPT tap must be upstream from unit GAS PRESSURE CHECK Logs are shipped secured in unit LOG PLACEMENT FORFront View of Logs LIGHTING INSTRUCTIONS MODULATING VALVEMAXITROL FOR YOUR SAFETY, READ BEFORE LIGHTINGOPERATING INSTRUCTIONS for “HIGH” LIGHTING INSTRUCTIONSto IGNITE and for “LOW”IGNITER ELECTRODE THERMO-COUPLE TO TURN OFF GAS TO APPLIANCEO.D.S PILOT BURNER THERMOSTAT CONTROL OPERATION MANUAL LIGHTING PROCEDUREFLAME CHECK INCORRECT FLAME PATTERN AT HIGH POSITION BURNER FLAME PATTERNCORRECT FLAME PATTERN AT HIGH POSITION Figure 1815 - Correct Burner Flame PatternJUMPERTHERMOSTAT WIRING DIAGRAMPOWER CORD MOTORSERVICING REPAIR PARTSCLEANING IMPORTANT SAFEGUARDSTROUBLE-SHOOTING POSSIBLE PROBLEMSOLUTION OBSERVED1.Control knob is not fully pressed in Delayed ignition of burner 1. Heater produces a clinking MODEL 1127 - MODULATING VALVE TECHNICAL SERVICEPARTS LIST MOTOR, AND ALL REMOVABLE PARTS BLOWN UP VIEW OF HEATER, FANBURNER SYSTEM PARTS LISTBLOWN UP VIEW OF BURNER ASSEMBLY NEW BUCK CORPORATION LIMITED WARRANTY ON VENT-FREEGAS LOG HEATER