New Buck Corporation MODEL FP-327-ZC Mantel Profiles For Zero Clearance Cabinet, Must Be Followed

Page 12
MANTEL PROFILES FOR ZERO CLEARANCE CABINET

MANTEL PROFILES FOR ZERO CLEARANCE CABINET

MUST BE FOLLOWED

MANTEL 3/4" FLAT SURFACE

CEILING

NAILING FLANGE

PICTURE. 1

COMBUSTIBLE

MATERIAL

3"

42"

 

2"

STAND OFF

FP-327-ZC

2"

MUST BE FOLLOWED 3/4" MANTEL 3/4" FLAT SURFACE2 1/2" FLAT SURFACE 10”

7”

2"

TOP TRIM (METAL)

 

 

LOUVERS

 

HOOD

MANTEL 3/4" FLAT SURFACE

 

CEILING

NAILING FLANGE

 

PICTURE. 2

3"

COMBUSTIBLE

12"

MATERIAL

42"

2"

3/4"

13”

 

10"

STAND OFF

FP-327-ZC

2"

2"

TOP TRIM (METAL)

 

 

LOUVERS

 

HOOD

 

 

2 1/2" FLAT SURFACE

 

 

 

CEILING

 

 

NAILING FLANGE

 

 

PICTURE. 3

COMBUSTIBLE

 

 

 

 

 

 

 

 

MATERIAL

 

 

42" MIN.

 

 

 

6"

 

 

2"

 

TO 12"

 

 

 

 

 

 

 

2-1/2"

5" MIN.

8”

 

STAND OFF

FP-327-ZC

2"

TOP TRIM (METAL)

 

 

 

 

 

 

 

 

2"

 

LOUVERS

 

 

 

 

 

 

 

 

HOOD

Figure 5

Page 10

Image 12
Contents MODEL FP-327-ZC NEW BUCK CORPORATIONManufacturer NEW BUCK CORPORATION P.O. Box 8000 Highway 226 South Spruce Pine, NCPage TABLE OF CONTENTS Page SECTION I SAFETY INFORMATION WARNINGS Page Page SECTION ZERO CLEARANCE INSTALLATION CHOOSING THE LOCATION FOR YOUR FIREPLACEGAS LINE DRAFTSFireplace and Framing Dimensions inches 3 1/47 1/2 PageINSTALLING THE FIREBOX FIREPLACE CLEARANCESInstall the Firebox Framing the FireboxFINISHING YOUR FIREPLACE CLEARANCESMANTEL PROFILES FOR ZERO CLEARANCE CABINET MUST BE FOLLOWEDMANTEL 3/4 FLAT SURFACE MANTEL 3/4 FLAT SURFACEINSTALLATION OF MODEL FP - 327- ZC WITH OPTIONAL WOODEN MANTEL1/2 WOOD SCREWS TOP MANTELREAR OF HEATER MANTEL BASESECTION AFTER MARKET MOBILE HOME INSTALLATION PRODUCING ADEQUATE VENTILATION DETERMINING FRESH-AIRFLOW FOR HEATER LOCATIONVent-freeheater VENTILATION AIR VENTILATION AIR FROM INSIDE BUILDINGVENTILATION AIR FROM OUTDOORS GAS CONNECTION FLAMEPLACEMENT OF LOGS SEE DIAGRAM ON PAGEGAS PRESSURE CHECK PLACEMENT OF LOGS 3 1 2 FigurePage FOR YOUR SAFETY, READ BEFORE LIGHTING LIGHTING INSTRUCTIONS MILLIVOLT VALVE ITTWHAT TO DO IF YOU SMELL GAS ROCKER SWITCH BEFORE INSTALLING THERMOSTATREMOVE METAL CONNECTOR PageIGNITOR ELECTRODE PILOT BURNERTHERMO--COUPLEPILE PageMANUAL LIGHTING PROCEDURE THERMOSTAT CONTROL OPERATIONLIGHTING INSTRUCTIONS MODULATING VALVEMAXITROL FOR YOUR SAFETY, READ BEFORE LIGHTINGLIGHTING INSTRUCTIONS to IGNITE andfor “LOW” for “HIGH”IGNITER ELECTRODE THERMO-COUPLE O.D.S PILOT BURNERTO TURN OFF GAS TO APPLIANCE MANUAL LIGHTING PROCEDURE THERMOSTAT CONTROL OPERATIONFLAME CHECK NATURAL PILOTBURNER PROPANE PILOTWIRING DIAGRAM NOTE #PESBRO84 Blower Model FP-327-ZC Rating 120 volts/60HZ/0.54 AmpsPage IMPORTANT SAFEGUARDS CLEANINGTROUBLE SHOOTING Air in gas lines when OBSERVED PROBLEM OBSERVED REPAIR PARTS SERVICINGPARTS LIST Maxitrol ValveBLOWN UP VIEW OF BURNER ASSEMBLY PageITT Valve PARTS LISTBLOWN UP VIEW OF BURNER ASSEMBLY PagePage Page